On July 9, the Bureau of Ecology and Environment of Wujin District, Changzhou City, Jiangsu Province, issued a public announcement of the approval opinions on the EIA documents of the 219 MW fishing-photovoltaic complementary photovoltaic project in front of Huanglingtai, Wujin, Changzhou, Jiangsu Huadian.

The content shows that Jiangsu Huadian Changzhou Wujin Qianhuang Lingtai 219 MW fishing-photovoltaic complementary photovoltaic project is located in Lingtai Village, Qianhuang Town, Wujin District, leasing 2895.56 mu of water surface and garden land in the village, with a total installed capacity of 260.3272 MWp. The rated capacity of AC side is 219 MW, and the power of double-sided double-glass N-type monocrystalline silicon module is 725 Wp.
According to the EIA documents previously published by the project, the investment in the photovoltaic area of the project is 79283 380000 yuan , and the construction period is 12 months. The construction unit of the
project is Huadian Jiangsu Ganyu Photovoltaic Co., Ltd .
浙公网安备33010802003254号