On June 24, Zhanhua Branch of Binzhou Ecological Environment Bureau of Shandong Province issued the Announcement on the Proposed Approval of the 200MW Photovoltaic Power Generation Project in Block B17-1 of Huaneng Binzhou Lubei Base.
The announcement shows that Huaneng Binzhou Lubei Base B17-1 Block Phase I 200 MW Photovoltaic Power Generation Project is located in Binhai Town, Zhanhua District, covering an area of 4.71 H ㎡, with a total investment of 735.5 million yuan . The construction period is 12 months.

The project uses about 4000 mu of beach land to build 200 MW (AC side capacity of 200 MW, DC side capacity of 216.0158 MW) photovoltaic power generation project . A total of 332,332 650 W p monocrystalline double-sided PV modules are installed, and the design scheme of 58 3.3MW square arrays, 1 3MW square array, 2 2.1M W square arrays and 1 1.2MW square array is adopted. Each square array adopts the connection mode of solar power generation unit and step-up transformer unit. The construction unit of the
project is Huaneng Zhanhua New Energy Co., Ltd .
浙公网安备33010802003254号