Zhongxin Group: Intends to invest 130 million yuan to set up a joint venture company to invest and operate photovoltaic power generation projects

2023-11-01 11:38:07

The registered capital of the joint venture company is 200 million yuan, of which Zhongxin Green Energy contributes 130 million yuan, accounting for 65% of the shares.

Zhongxin Group announced in the evening of October 31 that Zhongxin Green Energy, an indirect holding subsidiary of the company, intends to establish a joint venture with Hong Kong China Energy Investment Co., Ltd. to develop, invest, construct, acquire, hold and operate photovoltaic power generation projects. The registered capital of the joint venture company is 200 million yuan, of which Zhongxin Green Energy contributes 130 million yuan, accounting for 65% of the shares, and Hong Kong Energy Investment contributes 70 million yuan, accounting for 35% of the shares.

On the same day, Zhongxin Group also announced that the company intends to participate in the investment of Daotong Suzhou Angel Fund as a limited partner with its own funds, with the company's subscription capital not exceeding 30 million yuan, and accounting for no more than 20% of the total final fund subscription.              

All can be viewed after purchase
Correlation

The registered capital of the joint venture company is 200 million yuan, of which Zhongxin Green Energy contributes 130 million yuan, accounting for 65% of the shares.

2023-11-01 11:38:07

The total investment is about 2 billion yuan.

2023-10-31 17:58:42

Net profit of 366 million yuan, down 56.21% year on year.

2023-10-30 11:21:20

Signing contracts, starting construction and putting into production continuously.

2023-10-30 10:30:51

Full-year shipments are now expected to be appropriately revised down to about 7 GW.

2023-10-24 09:14:56

In the third quarter, the Company achieved a revenue of RMB5.512 billion, representing a year-on-year increase of 15.9%, and a net profit attributable to parent company of RMB438 million, representing a year-on-year increase of 6.63%.

2023-10-20 09:40:43

Net profit of about 401 million yuan, an increase of 135.92% over the same period.

2023-10-18 10:30:25

The Target Company is principally engaged in wind power generation and photovoltaic power generation.

2023-10-17 09:36:24

The total investment of the project is 485.1506 million yuan, and the total franchise period is 30 years.

2023-10-12 14:09:09

Solar power generation accounted for 55.99%, solar product manufacturing accounted for 43.88%, and others accounted for 0.12%.

2023-10-12 09:49:52

After the completion of the project, it is estimated that the average annual power generation will be about 2.7 billion kWh.

2023-10-08 09:24:16

Capacity additions in July were relatively low compared to 46.4 MW added in July 2022 and 84 MW added in June 2023.

2023-10-07 10:57:06

The total investment of the project is 833 million yuan. After the completion of the project, the average annual on-grid electricity will be 374.2753 million kWh, the annual coal saving will be about 114,200 tons, and the carbon dioxide emission will be reduced by about 304,700 tons.

2023-10-07 10:50:17

The total consideration of equity transfer is 430.5 million yuan and 351.5 million yuan respectively, involving 100MW photovoltaic installed capacity.

2023-09-28 13:14:38

Yan Wanpeng was appointed Secretary of the Party Committee of Henan Investment Group Co., Ltd.

2023-09-28 10:23:58

There are 108 lawsuits in which the company is the defendant.

2023-09-27 11:43:20

At present, the national production capacity does not exceed 100 billion meters, which is in short supply in the market.

2023-09-13 09:16:47

The director and CEO resigned at the same time.

2023-09-13 09:16:08

The People's Government of Lishui District, Nanjing City, Jiangsu Province announced the environmental impact assessment of the new project of Nanjing Xinning Yao Glass Technology Co., Ltd. with an annual output of 900000 square meters of special curtain wall and photovoltaic glass production line.

2023-09-12 09:28:34

The Company currently has 4 PV glass production lines with a daily melting capacity of 4,600 tons.

2023-09-11 09:30:59

In the first half of 2023, the company's stent system orders in hand amounted to about 2.966 billion yuan.

2023-09-08 10:28:12

For projects that have not started construction or have not gone through any other formalities within two years after filing, renewable energy projects that do not meet the construction conditions, are not included in the annual development plan of renewable energy in the province, occupy resources for a long time and have not been completed for a long time..

2023-09-07 15:25:12

The company's large storage project reserves 26 gigawatt hours, and has signed contracts with orders in hand amounting to $2.1 billion, including long-term service contracts.

2023-09-05 09:39:42

It took only four months to realize the first product offline and formal mass production.

2023-09-04 13:23:29

On July 30, after more than six hours of continuous operation, the first pier of Ankang Bridge on Kangyu high-speed rail was successfully poured, which is the first pier to be poured on the whole Shaanxi section of Kangyu high-speed rail.

2023-08-02 17:47:31