Recently, the pilot Qingkou Saltworks 250 MW fishing-photovoltaic complementary "photovoltaic composite" project officially started construction.
2025-10-15
At 22:06 on October 14, Beijing time, Huaxin's first self-owned international cargo ship from Mozambique arrived in Comoros smoothly and delivered 2000 tons of cement to customers. This marks the success of the first voyage of Huaxin Mozambique Company to the Comoros market, the zero breakthrough of Huaxin's export business to the Indian Ocean island countries, and another important step in its international development.
2025-10-15
Since October 15, some leading enterprises in the province have again notified Hangjiahu and Shaoxing in northern Zhejiang to raise the price of various kinds of cement by 30 yuan/ton, and the implementation remains to be observed.
2025-10-15
In the first half of the week, the two leading companies raised their quotations one after another, and the price of photovoltaic modules increased significantly.
2025-10-15
In October 11th, the price of Guanzhong cement in Shaanxi was raised by 60 yuan/ton.
2025-10-15
On October 15, the new energy cloud platform of the State Grid announced the bidding results of Xinjiang's mechanism electricity price, in which the results of photovoltaic clearing were: the scale of mechanism electricity was 3.6 billion kWh, a total of 31 projects, and the mechanism electricity price was 0.235 yuan/kWh; the total scale of wind power was 18.5 billion kWh, a total of 36 projects, and the mechanism electricity price was 0.252 yuan/kWh.
2025-10-15
Since October 15, some leading enterprises in the province have again notified many places such as Suzhou, Wuxi and Changzhou to raise the price of all kinds of cement by about 30 yuan/ton.
2025-10-15
The market price range of C30 concrete in Hubei Province is 245-295 yuan/m3, showing certain regional differences.
2025-10-15
On October 10, the Department of Ecology and Environment of Guangxi announced the acceptance of environmental assessment and approval of a batch of 500MW photovoltaic power generation projects of Beijing Energy Qinzhou Great Wall Million Kilowatt New Energy Demonstration Base Project (Phase II 850MW). The applicant is Qinzhou Jingneng Clean Energy Co., Ltd., a subsidiary of Beijing Energy Group.
2025-10-15
On October 14, Western China Cement and China Water Conservancy and Hydropower Third Engineering Bureau Co., Ltd. (Hereinafter referred to as "the Third Hydropower Bureau") signed a strategic cooperation agreement at the headquarters of the Group. Wang Qi, Party Secretary and Chairman of the Third Hydropower Bureau, Cao Jianshun, CEO of Western Cement and Chairman of Yaobai Group, and Wang Jiujun, General Manager of Yaobai Group, attended the ceremony and witnessed the signing. The meeting was presided over by Wang Fayin, Vice President of Western Cement.
2025-10-15
On October 9, Gemeng Yihe New Energy Co., Ltd. Chayouqianqi Wind and Solar Hydrogen Production Integration Project (Phase I) EPC general contracting tender for new energy part issued the third extension announcement.
2025-10-15
On October 10, the State Administration of Mine Safety announced the key points of disaster provention and control for non-coal mines. In order to guide non-coal mining enterprises to enhance their disaster prevention and control capabilities, the State Administration of Mine Safety has organized and compiled the Key Points for Disaster provention and control of Non-coal Mines (Annex), which aims to help and guide non-coal mining enterprises nationwide to do a good job in disaster provention and control, not as a mandatory requirement and basis for law enforcement.
2025-10-15
Recently, the Natural Resources Bureau of Qiyang City, Hunan Province, made a public response to the issue of "illegal sales of Conch Cement Co., Ltd. in Qiyang County" previously reflected by the public. Previously, on September 17, a group of private entrepreneurs reported through the "Red Net People's Voice" that "Qiyang Conch Cement Co., Ltd. had violated the regulations to sell limestone for cement and disrupt the market".
2025-10-15
Among them, the photovoltaic clearing results are as follows: the scale of machine-made electricity is 3.6 billion kWh, a total of 31 projects, and the machine-made electricity price is 0.235 yuan/kWh;
2025-10-15
Hebei released 97 energy storage pilot projects with a total scale of 13.82 GW/47.03 GWh, mainly promoting multi-technology hybrid routes such as lithium iron phosphate + sodium ion.
2025-10-15
On October 14, the National Development and Reform Commission issued a circular on the issuance of the Measures for the Special Management of Investment in the Central Budget for Energy Conservation and Carbon Reduction.
2025-10-15
By the end of September this year, Jinlang Science and Technology had realized revenue of 5.663 billion yuan, an increase of 9.71% over the previous year, net profit of 865 million yuan, an increase of 29.39% over the previous year, and non-net profit of 802 million yuan, an increase of 27.32% over the previous year.
2025-10-15
The mineral resource is located in Shishanshang Village, Yujiagou Village, Liulin Town, Liulin County, with a resource reserve of 34.524 million tons of limestone (including 19.798 million tons of limestone for cement and 14.726 million tons of limestone for building stone).
2025-10-15
Shangfeng Cement announced on the evening of October 14 that its subsidiary invested 53.2 million yuan to establish Suzhou Qihong Venture Capital Partnership (Limited Partnership) in cooperation with professional institutions, which is the 20th enterprise invested in the field of Shangfeng Semiconductor. In this investment, Shangfeng has jointly invested with two listed companies in Hefei semiconductor industry chain, Huicheng Stock and Hefei Jinghe Integration.
2025-10-15
On October 9, the People's Government of Tongzhou District, Nantong City, Jiangsu Province, issued an announcement on the approval of environmental impact assessment documents for five construction projects. It includes the 11.73 MW (AC side) fishing-photovoltaic complementary power generation project in Xingren Town, Nantong City and the 80 MW (AC side) fishing-photovoltaic complementary power generation project in Dongshe Town, Nantong City.
2025-10-15