Nigeria local time, the 6000t/d clinker cement production line of Obajana Line 5 of Dangote Group in Nigeria, which was contracted by Sinoma International (Nanjing) and organized by Suzhou Sinoma, was successfully ignited. It marks that the project has been transferred from construction to performance assessment. The
sudden outbreak of the epidemic caused difficulties such as the shortage of labor force and the inability of professional engineers from equipment manufacturers to be present for commissioning. The project department made concerted efforts to overcome the difficulties. On the premise of doing a good job in epidemic prevention, it took the initiative to complete the construction and commissioning work on schedule, and finally achieved the goal of ignition on schedule, which won high praise from the owners.