On January 22, the successful candidates for the EPC project of the first and second bid sections of the 1 million kilowatt photovoltaic project in Midong District of Xinjiang 6806 Energy were announced, and three enterprises were shortlisted. The highest unit price is 1.83 yuan/W (China Energy Engineering Group Hunan Thermal Power Construction Co., Ltd.), and the lowest is 1.71 yuan/W (Xingneng Power Construction Co., Ltd.). The Second Construction Engineering Company of China Construction Third Engineering Bureau became the first candidate of the first bid section with 1.72 yuan/W, and the China Construction Third Engineering Bureau Group became the first candidate of the second bid section with the same unit price. The project
is located in Midong District of Urumqi, with a scale of 1GW and 1.389 million N-type components . It is constructed in three sections with a total construction period of 300 days. The winning candidates for the first and second bid sections have been announced, and the winning candidates for the third bid section will be opened and announced at 11:00 on February 4, 2026.
浙公网安备33010802003254号