On November 20, the Chisha (Phase II) photovoltaic power generation project in Maoxian County, Aba Prefecture started smoothly.
The project is constructed by Datang (Aba) New Energy Development Co., Ltd. It is located in Wadi Town and Shaba Town, Maoxian County, Aba Xizangan and Qiang Autonomous Prefecture, Sichuan Province, with a total investment of about 631 million yuan, a total AC side installed capacity of 150MW, a total of 42 photovoltaic arrays, a new 220 kV booster station, and a construction period of about 9 months.
浙公网安备33010802003254号