, 2026, the Development and Reform Commission of Hebei Province issued the Announcement on the Proposed Adjustment of Wind Power and Photovoltaic Projects Due to Participate in the Centralized Grid-connected Action in 2025.
A total of 31 wind and solar projects were involved, with a total capacity of 3.3885 million kilowatts, including 5 (633000 kilowatts) photovoltaic projects. Of the 31 projects, 30 grid-connected projects were postponed and the scale of one photovoltaic project was reduced. Five photovoltaic projects involve enterprises such as State Power Investment Corporation, Datang Group and China Electric Power Construction Corporation. Four of them were postponed, and the construction scale of Jingxing 200 MW photovoltaic power generation project of the State Power Investment Corporation was reduced to 127,200 kilowatts.
浙公网安备33010802003254号