2025, China Power Construction New Energy Group Zhaoan Sidu 120 MW Fishing-Photovoltaic Complementary Power Station Project started in Sidu Town, Zhaoan County, Zhangzhou, Fujian Province. The total investment of the project is about 525 million yuan. The mode of "power generation on the board and fish farming under the board" is adopted. The DC side is installed with 144.01 MW, the AC side is installed with 120 MW, and the 12 MW/24 MWh energy storage system is built. The project
was invested by Zhaoan Juyuan New Energy, after the EPC general contracting tender was issued on November 12. It was originally planned to start construction on December 15, 2025 and hand over production on December 15, 2026.
浙公网安备33010802003254号