On August 17, the EPC general contracting project of 400000 kilowatt photovoltaic project in Hutubi, Changji, Xinjiang was tendered publicly.
The project plans to build 400000 kilowatts of photovoltaic power, supporting the construction of 50 MW/100M Wh energy storage , which is a turnkey project for EPC general contracting. The construction period is 16 months from the signing of the contract, including the local winter break.
The tender requires the bidder to have at least one similar EPC performance, or one similar design and one similar construction performance at the same time from January 1, 2021 to the present. A consortium composed of no more than 4 units is accepted for bidding, and the leading party is required to be the construction unit. The bid will be closed and opened at 10:30 on September 7.
浙公网安备33010802003254号