Tender Announcement for Circulating Water Pump Energy-saving Renovation Project of Shuozhou and Ulanhot Companies

2026-07-03 17:57:46

Shanshui Group invited public bidding for energy-saving renovation projects of circulating water pumps in Shuozhou and Ulanhot, requiring pump manufacturers to bid independently, provide all-inclusive renovation services, adopt a two-round quotation mechanism, and emphasize technical adaptation, quality and performance responsibilities.


1. Bidding Description


Shandong Shanshui Cement Group Co., Ltd. (Hereinafter referred to as "Shanshui Group") is headquartered in Jinan City, Shandong Province. Cement production and

II. Project Overview


1. Project Name : Shuozhou, Circulating Water Pump Energy-saving Renovation Project

of Ulanhot Company 2. See Part II Technical Requirements in the Bidding Document for specific technical standards, supply and construction scope. 3.4.5.6

. The quotation of the first round of bidding is a reference quotation, which is only used as the basis for centralized communication of bid opening, clarification of quotation caliber and unification of technical response standards; The bid opening and clarification link only unifies the quotation caliber, clarifies the technical boundary, and does not change the substantive requirements of the bidding documents; after clarification, the tenderee issues a unified secondary quotation template, and the bidder submits the secondary quotation as required. The Tenderee has the right to conduct commercial negotiation on the supply, service, quality assurance and other contents of the candidate to be the bid winner before the bid award, and require the candidate to make additional preferential commitments. The negotiation is only an auxiliary link of the bid award, and will not change the validity of the second quotation of other bidders.

(2) Scope of quotation: The quotation of this tender is the total fixed tax-inclusive price of the whole cost. Including equipment body, auxiliary materials, spare parts, dismantling and transportation of old equipment and environmental protection recycling, equipment installation, electrical wiring, system commissioning, energy efficiency testing, acceptance cooperation, personnel training, all services during the quality assurance period, as well as transportation, loading and unloading, insurance, site survey, construction tools and safety protection equipment, 13% value-added tax, etc., unless otherwise stipulated in the contract. The Buyer shall not incur any additional expenses.

(3) Payment method : The benchmark payment method is as follows (the payment method is an important factor for bid evaluation, and the bidder can submit a better scheme): ① Within 30 days from the date when the whole system passes the performance acceptance, The Buyer shall pay 90% of the total contract price of the corresponding project in the form of electronic bank acceptance; ② 10% of the total contract price of the corresponding project shall be used as the quality guarantee deposit, which shall be paid without interest after the expiration of the quality guarantee period without objection. Following the principle of "invoice first, payment later", the Seller must issue a legal and valid special invoice for 13% of the value-added tax of the full amount of the contract in advance. If the invoice is not provided, the Buyer has the right to refuse to pay for the goods and shall not be liable for breach of contract.

(4) Technical communication method : After the opening of the first round of bidding documents, centralized communication and clarification will be carried out with all qualified bidders through the Tencent online conference.

(5) Site survey : The Tenderee will not organize site survey uniformly. Before participating in the bidding of the corresponding project, the bidder shall contact the technical contact of the buyer to make an appointment for reconnaissance and fully verify all the working conditions on the site. All the expenses and responsibilities incurred during the reconnaissance, such as transportation, accommodation, personal and property safety, shall be borne by the bidder. Site survey is only a reference for the Tenderer to understand the site conditions of the project, and does not constitute any commitment of the Tenderee to the site working conditions and construction conditions. The Tenderer shall evaluate the impact of site conditions on the bidding and project implementation by itself, and incorporate relevant factors into the tender offer.

7.



3. The bidder's qualification requires


that the bidder must meet the following access conditions and provide valid supporting documents in the bidding documents. If there are no supporting materials, the bidder's qualification is deemed to be substandard. Only the pump manufacturers with independent production capacity can participate in the bidding, and the bidding of agents is not accepted. 1.2

. Installation of core equipment and system commissioning of the Project shall not be subcontracted; If the construction of auxiliary wiring and pipeline adaptation needs to be subcontracted, the bidder must specify the construction organization mode in the bidding documents. After winning the bid, the bidder must submit the qualification documents of the proposed subcontractor to the buyer for review before entering the site, and the bidder can enter the site only after the buyer's approval. No matter what kind of construction method is adopted, the bidder shall be jointly and severally liable for the construction quality, safety and construction period of the project, and the buyer shall only interface with the bidder, and shall not have a direct contractual relationship with the subcontractor.

3.

4.

5.

6.7.8

.




IV. Registration, Bidding and bid opening schedule


1.2

. Registration method : Bidders must log in the platform of Daqihui (https://www.daqihui. that no qualification information is required to be submitted at the registration stage. All qualification certificates shall be subject to the bidding documents submitted by the bidder; the successful application does not mean that the bidder is qualified, and the final qualification conformity shall be subject to the post-qualification results of the evaluation team. 3.4.5

. Submission method of bidding documents: the bidder must submit the bidding documents before the deadline. Upload the complete bidding documents (PDF format) with official seal to the corresponding project port of the large enterprise exchange platform and the designated mailbox 841307051 @ QQ. The name of the electronic bidding documents is unified as [full name of the bidder + Shuozhou Ulanhot circulating water pump transformation].

6. If the bidder fails to prepare or submit the tender documents in accordance with the requirements of the tender documents, or fails to meet the qualification requirements of the bidder in Article 3 of this announcement, it shall be treated as an invalid tender and shall not enter the bid opening and subsequent evaluation process.

7. After the review is completed, the tenderee shall send the bid opening Tencent meeting number and relevant arrangements to the qualified bidders separately, and the invalid bidders shall not participate in the bid opening and all subsequent links.



5. Other matters


1. Announcement release channel : This announcement is published on the platform of Big Enterprise Exchange (https://www.daqihui.2.3.

equipment quality, If the core parameters fail to meet the standards, resulting in failure to pass the acceptance and affecting the production plan, the tenderee has the right to unilaterally terminate the contract and investigate the corresponding liability for breach of contract of the bidder.

4.

All can be viewed after purchase
Correlation

Northeast No.4 Company of Shanshui Group invites public bidding for 6 sets of automatic loading palletizers and 4 sets of film wrapping machine systems, and carries out pre-qualification, second round quotation and bid division, requiring bidders to have performance, qualification and good credit in the cement industry.

2026-11-03 19:56:58

Shanshui Group invited public bidding for the coal procurement of Zaozhuang Innovation and Linqu Company in November 2026, and adopted the online one-time quotation and the lowest bid (the bid can flow beyond the market price). The main body of signing and settlement is Jinan Shanshui Logistics Port, with a performance bond of 1 million yuan.

2026-11-03 19:56:55

Kazuo Company of Shanshui Group carried out public inquiry and price comparison bidding for the preparation of feasibility study report, mining plan and ecological restoration plan of Lianjiawa Mine, aiming at promoting the procedures of exploration and mining and ensuring compliance review and filing.

2026-11-03 19:56:46

Shanshui Group publicly inquired about the price comparison for the supervision service of the demolition project of the grinding production line assets of Dongying Company, requiring the bidder to have the corresponding qualifications, performance and credit conditions, to implement the second round of quotation, with a service period of 110 days, and to adjust the cost according to the facts.

2026-11-03 19:56:38

Shanshui Group publicly inquired about the price comparison of fly ash and other materials and clinker transportation projects of Dongming, Caoxian and Gucheng from 2026.11 to 2027.10, requiring bidders to have qualifications, transportation capacity, reputation and compliance operation capabilities.

2026-11-02 19:57:03

From November to December 2026, Shanshui Group carried out public inquiry and procurement of slag powder and low-alkali limestone for Dongming and Kazuo companies, adopting post-qualification, one-time quotation and online bidding, emphasizing supplier qualification, performance ability and compliance credit.

2026-11-02 19:56:54

Shanshui Group invited public bidding for coal procurement of its four subsidiaries in October 2026, adopting an online quotation, winning the bid at the lowest price (flowable bid), and setting up a performance bond mechanism of 1 million yuan.

2026-10-27 19:59:27

Linfen Company of Shanshui Group carries out public inquiry and price comparison bidding for topographic mapping and survey and delimitation projects such as mine transportation roads, requiring bidders to have corresponding qualifications, performance and performance capabilities.

2026-10-27 19:56:30

Shanshui Group publicly inquired about the price comparison of solid waste transportation projects such as fly ash from 2026.10 to 2027.10 of Dongming and other five companies, requiring bidders to have qualifications, transportation capacity, credit and new energy vehicles.

2026-10-26 19:57:03

Shanshui Group carried out public inquiry and procurement for desulfurization gypsum and stone chips transportation projects of Gongyuan, Liaoyang and Yongzhongsheng from October to December 2026, requiring bidders to have qualifications, transportation capacity, reputation and compliance operation capabilities.

2026-10-22 19:56:53

Linfen Company of Shanshui Group made an open inquiry on price comparison for the technical service of 1538-1566m geological detailed survey, sampling and testing. The bidder is required to have the qualification, performance ability and good credit. The deadline for online bidding is October 27, 2026.

2026-10-22 19:56:33

Shanshui Group invited public bidding for the procurement of ceramic hanging pieces for preheaters of four subsidiaries, with a total of 7 sets, about 251.58 ㎡, and implemented pre-qualification, second round of quotation, bid division, all-inclusive price including tax and installation costs.

2026-10-22 19:56:22

Shanshui Group invites public bidding for the general contracting project of ultra-low emission construction of Wuxiang Company, requiring bidders to have corresponding qualifications, performance and credit conditions, and adopting the mode of pre-qualification, second round quotation and fixed comprehensive unit price contracting.

2026-10-20 19:57:53

Huludao Company of Shanshui Group carried out public inquiry and comparison procurement for powder fluorite powder and coal sand from October to December 2026, adopting post-qualification, one-time quotation and online bidding, emphasizing supplier qualification, performance ability and compliance credit requirements.

2026-10-20 19:56:49

Yingjisha Shanshui Cement Co., Ltd. openly recruits a director of quality control department, requiring more than 6 years of experience in cement testing, professional qualifications and quality management capabilities, with a salary of 12000 yuan per month, which is a key enterprise in Shandong's aid to Xinjiang.

2026-10-19 12:55:43

Shanshui Group invites public bidding for the project of improving the network security of power monitoring system of Aqi Company, requiring bidders to have corresponding qualifications, performance and safe construction capabilities, and to implement the total price and the second round of quotation.

2026-10-13 19:57:14

Weishan Company of Shanshui Group made a public inquiry on the planning of mountain forests and grasslands and the optimization and adjustment of protected areas for survey and delimitation projects, requiring compliance with qualifications, achievement standards and government review and filing.

2026-10-13 19:57:02

Jincheng and Heju companies of Shanshui Group carried out public inquiry and procurement of dedusting ash and gasification furnace ash from October to December 2026, using online platform for one-time quotation and post-qualification, emphasizing compliance, supply guarantee and credit requirements.

2026-10-09 12:56:07

Shanshui Group invited public bidding for coal procurement of eight subsidiaries in October 2026, adopting online one-time quotation and winning the bid at the lowest price (exceeding the market price), which was settled by Jinan Shanshui Logistics Port, and set up a performance bond mechanism of 1 million yuan.

2026-10-09 12:55:52

Shanshui Group publicly inquired about the price comparison of clinker and desulfurized gypsum transportation projects of Tianjin and Dalian companies in the fourth quarter of 2026, requiring bidders to have qualifications, transportation capacity, reputation and compliance operation capabilities.

2026-09-30 19:57:26

Shanshui Group made an open inquiry on the procurement of clinker and slag powder transportation projects of Liaocheng and Shanghe Companies from September to December 2026, and invited tenders for transportation enterprises with qualifications, good reputation and compliance capacity.

2026-09-11 19:56:57

Wuxiang Company of Shanshui Group carries out public inquiry and procurement of coal mill roller core (including briquetting), requiring bidders to have qualifications, performance and credit conditions, and to adopt online platform for one-time quotation and full price settlement.

2026-08-26 12:56:30

Shanshui Group invites public bidding for the precise denitrification transformation projects of Yingjisha, Liaoyang Qianshan and Baishan Companies, and carries out pre-qualification, sub-bidding and second-round quotation, requiring bidders to have environmental protection/mechanical and electrical qualifications, performance and safety performance capabilities.

2026-08-19 19:56:11

Shanshui Group invited public bidding for coal procurement of Lvliang and Huixian companies in August 2026, using online quotation, winning the bid at the lowest price (not exceeding the market price), setting a performance bond of 1 million yuan, emphasizing the requirements of qualification, credit and compliance.

2026-08-18 19:56:32

Jincheng Company of Shanshui Group carries out public inquiry and procurement of dry desulfurization equipment, requiring bidders to have qualifications, performance, credit and intellectual property compliance, and adopts online platform for one-time quotation and bidding.

2026-08-18 19:56:28

Shuozhou Company of Shanshui Group conducted public inquiry and price comparison bidding for mine feasibility study report, preliminary design and safety facilities design projects, requiring bidders to have Grade A design qualification and similar performance, and the project must be reviewed and filed in compliance.

2026-08-18 19:56:16

Shanshui Group invites public bidding for the new 1000-ton steel silo project of Zibo Shuangfeng Company by means of pre-qualification, second-round quotation and fixed comprehensive unit price contracting, which is aimed at construction enterprises with corresponding qualifications and performance.

2026-08-17 23:56:47

Shanshui Group carried out public inquiry and procurement of slag and other auxiliary materials for eight subsidiaries from August to December 2026, using post-qualification, one-time quotation and online bidding methods.

2026-08-17 23:56:41

Shanshui Group invited public bidding for exploration, slope survey and stability analysis, preparation and evaluation of concealed disaster-causing survey report of Hougou Mine in Yishui, emphasizing the requirements of qualification, performance, credit and professionals.

2026-08-07 19:56:47

Shanshui Group focuses on market-oriented transformation, coordination of production and marketing, cost reduction and efficiency enhancement, emergency supply and capacity improvement, and comprehensively promotes high-quality development.

2026-07-20 23:59:47

Shanshui Group launched a public inquiry and price comparison bidding for the feasibility study report, preliminary design and safety facilities design of the mines of Lvliang and Weishan companies, requiring bidders to have Grade a qualifications and similar performance, and to pass the government evaluation and filing.

2026-07-09 15:58:55

Liaoyang Company of Shanshui Group purchased one set of reverse osmosis water production equipment through public inquiry, requiring the bidder to be the original factory or integrator with five sets of performance, with all-inclusive price including tax and all services, strict qualifications and online bidding.

2026-07-06 23:58:50

Shanshui Group invited public bidding for energy-saving renovation projects of circulating water pumps in Shuozhou and Ulanhot, requiring pump manufacturers to bid independently, provide all-inclusive renovation services, adopt a two-round quotation mechanism, and emphasize technical adaptation, quality and performance responsibilities.

2026-07-03 17:57:46

Shanshui Group invites public bidding for the + 80m slope treatment, platform ecological restoration and green mine upgrading project of Hutishan Mine in Zaozhuang, and adopts the pre-qualification system, requiring bidders to have corresponding qualifications, performance and good credit.

2026-03-19 16:09:24

Recently, Yulin Natural Resources Bureau and Yulin Agricultural and Rural Bureau reported 15 typical cases of land violations (hereinafter referred to as "notification"), including the case of illegal land occupation and construction of industrial explosive storage warehouse by Xingye Hongshi Cement Co., Ltd.

2025-07-08 15:17:16

Strengthen industry self-discipline, create a standardized, orderly, stable and healthy development of the industry ecology; to strengthen policy regulation, adhere to the results-oriented, comprehensive measures to promote high-quality development of the industry. More than 20 persons in charge of leading enterprises such as Shanshui Group, Zhonglian Cement, Quanxing Energy and some small and medium-sized cement enterprises, as well as relevant persons in charge of the Provincial Department of Ecology and Environment and the Provincial Cement Industry Association attended the meeting.

2024-09-09 09:34:36

This is a statistical table of port coal prices, covering the mainstream ports in the Bohai Rim, East China, South China and other regions, covering the corresponding price changes of various types of coal with different calorific values, and the weekly prices of several groups of valid statistical samples show different adjustments. Among them, the weekly change value of the category with a high change range is 30, and the weekly change value of some other categories does not produce any value change, while the change value of the remaining valid statistical categories is distributed between these two categories.