On June 24, the Fujian Provincial Office of Industry and Information Technology announced that the cement clinker production lines used by five enterprises in the province for capacity replacement had been shut down, the main equipment had been dismantled, and the conditions for resumption of production were not met.

1. Fujian Shunchang Stone Refining Cement Co., Ltd. has shut down a cement clinker production line with a daily output of 2500 tons for capacity replacement, and its main equipment, a Ф4.0 × 60 m rotary kiln, has been dismantled;
2. Fujian Yongan Jinyinhu Cement Co., Ltd. has shut down a cement clinker production line with a daily output of 2500 tons for capacity replacement, and its main equipment, a Ф4.0 × 60m rotary kiln, has been dismantled;
3. Fujian Yongan Wannian Cement Co., Ltd. has shut down a cement clinker production line with a daily output of 2500 tons for capacity replacement, and its main equipment, a Ф4.0 × 60m rotary kiln, has been dismantled;
4. Fujian Chunchi Group Xinfeng Cement Co., Ltd. has shut down a cement clinker production line with a daily output of 2500 tons for capacity replacement, and its main equipment, a Ф4.0 × 60m rotary kiln, has been dismantled;
V. China Resources Cement (Zhangping) Co., Ltd. has shut down a cement clinker production line with a daily output of 2500 tons for capacity replacement, and its main equipment, a Ф4.0 × 60 m rotary kiln, has been dismantled.
With the full implementation of capacity replacement work in various regions, a large number of cement production lines included in the scope of capacity replacement are being shut down and dismantled one after another, formally withdrawing from the market.
According to the incomplete statistics of China Cement Network, since this year, 38 cement clinker production lines have been announced to be dismantled and withdrawn without conditions for resumption of production, with a total capacity of 30.54 million tons (calculated by 300 days) , as shown in the following table:

浙公网安备33010802003254号