On October 12, Xinjiang Changji Hutubi 400MW Photovoltaic Project EPC General Contracting Project (Bid Section II: 250MW Photovoltaic) was tendered. Located in Hutubi County, Changji Autonomous Prefecture, Xinjiang, the project
adopts turnkey EPC mode, and the contracting scope covers all construction drawing design and technical services of the whole project except the transmission line. At the same time, it includes the whole process management and control of the installation and commissioning of the 250000 kilowatt photovoltaic area and energy storage station, temporary facilities, equipment transfer, grid-connected acceptance, etc.
The bidder shall have relevant PV EPC or supporting design and construction performance after January 1, 2021. This tender accepts the bidding of a consortium composed of up to two units, and the leader of the consortium must be the construction unit. The bid closing/opening time is 10:30 on November 2, 2026.