On October 9, China Water Conservancy and Hydropower Fifth Engineering Bureau Co., Ltd., a subsidiary of China Electric Power Construction, disclosed that the 300000 kilowatt photovoltaic composite project in Futula, Lingwu City, Ningxia, was officially started. Located in Lingwu City, Ningxia, the
project is a mountain photovoltaic project , with a total investment of about 893 million yuan, an installed capacity of 300 MW and a DC side installed capacity of 344.5M Wp. The construction unit is China Power Construction (Lingwu) New Energy Co., Ltd. After
completion, the project will be connected to the core power grid of Ningdong, which can provide about 476 million kilowatt-hours of clean electricity annually.
浙公网安备33010802003254号