This week, photovoltaic " this week, three first-line manufacturers have lowered the price of components. According to Digital New Energy DataBM.
In addition, at present, component manufacturers are pessimistic about the market expectations in June: the demand for overseas orders has not improved significantly, and the start-up of domestic power plant projects is still slow. Inventory pressure continues to increase, and the difficulty of price is increasing . The SNEC exhibition in 2026 is approaching, and the price adjustment action is still generally on the sidelines.
Specifically,
the price of TOPCon components dropped slightly, with the price range concentrated at 0.70-0.This week, three first-line manufacturers lowered their quotations. At present, the average transaction price of leading enterprises has generally fallen to 0.73-0.76 yuan/W , while that of second-tier and third-tier manufacturers is generally 0.70-0.
It is worth noting that the trend of hot sales of degraded products is also transmitted to second-tier and third-tier manufacturers. Its recent shipments are mostly concentrated on the relatively unpopular power segment degradation products in the market, such as 580-590 W and 700-710 W products. The price is as low as 0.60-0.
The quotation range of BC components is maintained at 0.75-0. This week, the overall price is stable, and the mainstream transaction price of leading enterprises is still stable at 0.81-0. At present, 660W power segment products are relatively scarce on the market, and the price of this product is 0.01-0 higher than that of 650-655W hot-selling products of the same size.
The price of HJT components remains stable. The overall range is maintained at 0.73-0. At present, the production scheduling level of HJT manufacturers is low, with an average monthly output of no more than 1GW, and the spot volume of distribution channels is also at a low level. Supported by this, the transaction price of HJT modules remained relatively stable, with no further decline this week, and highly concentrated at 0.75-0.
On the supply side , the overall production schedule in June was the same as that in late May, with only a few manufacturers increasing. It should be noted that the increase in the production schedule of the manufacturer was mainly due to the consolidated statistics after the acquisition of the production line , which did not actually increase the operating rate of the production line. According to Digital New Energy DataBM.
In the overseas market , demand remained stable this week. According to feedback from some traders, there is a strong demand for purchasing in Europe and Australia, but there has not been a significant increase in the manufacturer side. In addition, the overall overseas quotation also remained stable, with the head manufacturer's quotation highly concentrated at 0.11-0. This week, taking the European market as an example, the TOPCon component quotation was at $0.11-0.13/W . The quotation range of BC components is 0.12-0. At present, the
distributed market demand mainly focuses on degraded products and scattered orders. Impulse near the end of the month, some dealers began to transfer degraded components in order to stabilize sales. In addition, some MW-class projects have stagnated this week. According to some leading manufacturers, the
centralized market demand for digital new energy DataBM has declined again, and the one-week bidding demand has risen slightly to 0.7 GW . Mainly from Guangdong Energy Group 2026 of 0.
The price information obtained from the survey of the digital new energy DataBM. Com is as follows:
TOPCon components: the price range is 0.70-0.BC;
components: the price range is
0.75-0.H JT components: the price range is 0.73-0.
The above survey price is the price including tax and excluding transportation.
The above price data is from DataBM.