On September 10, China Coal Group announced the successful candidate for the EPC general contracting project of 1500MW Photovoltaic Sand Control Project (Phase I 1000MW) in Tianxian County.
The announcement shows that there are three enterprises shortlisted, the first successful candidate is East China Survey and Design Institute of China Electric Power Construction Group (with a quotation of about 5.106 billion yuan), the second and third candidates are Hubei Electric Power Planning and Design Institute and Chengdu Survey and Design Institute of China Electric Power Construction Group respectively.
It is reported that the project is located in Yutian County, Hetian, Xinjiang, with a total scale of 1500MW, which is divided into two phases: the first phase has an installed capacity of 1000MW, supporting 100MW/200MWh energy storage ; the second phase has a scale of 500MW, supporting 50MW/100MWh energy storage.