On August 29, the Hebei Development and Reform Commission announced the "second batch of projects to be arranged for the annual development and construction plan of wind power and photovoltaic power generation in 2025", totaling 81 projects with a total scale of 7.486 million kilowatts (about 7.49 GW).
Among them, there are 42 photovoltaic projects (including one wind, solar and storage integration) with a scale of 3.129 million kilowatts (about 3.13 GW). The main body of
the project involves 12 state-owned enterprises and 9 private enterprises (including Xiexin Group and TBEA).
Among them, Huadian Group has the largest number of projects, with 13 projects of 418,000 kilowatts; Datang Group has 4 projects of 710,000 kilowatts; China Energy Group and South-to-North Water Diversion Group have 3 projects of 210,000 kilowatts and 112,000 kilowatts respectively.