On December 23, the Development and Reform Commission of Hebei Province announced the proposed adjustment of wind power and photovoltaic projects in 2025: after investigation, 103 projects were proposed to be adjusted, with a total scale of 14.9 GW, including 5.7 GW of photovoltaic and 9.2 GW of wind power. Among them, the construction plan of 1.22 GW project was cancelled, and the construction of 12.8 GW project was postponed. In addition, the index of 6 projects was reduced by 477 MW. At the same time, it was announced that 321 reserve projects would be retained, with a total scale of 38.8GW, including 173 photovoltaic projects with a scale of 20.8GW and 151 wind power projects with a scale of 18 GW.
浙公网安备33010802003254号