On August 19, Sichuan Suining Health and Environment Bureau announced that the EIA of 7.2G W high-efficiency crystalline silicon heterojunction photovoltaic cells and components project of Power Investment New Energy Technology (Suining) Co., Ltd. It is reported
that the project is located in Suining Chuanshan High-tech Zone, with a total investment of 3 billion yuan. It is planned to build eight battery production lines (including three 600MW, four 1.2G W silver grid lines and one 600MW copper grid line) and five 1.2G W component production lines. After the completion of the
project, it is expected to produce 7.2G W high-efficiency heterojunction batteries and 6G W module products annually, with a construction period of about 48 months.