China Construction First Engineering Bureau and China Construction Fifth Engineering Bureau won the bid by 500 million and 600 million respectively!

2025-08-18 10:29:43

Successful candidate of Jinhe Plaza Phase I Construction Project: China Construction First Bureau (Group) Co., Ltd., bid price: 528115608.00 RMB.

Project Name: Announcement of

Successful Candidates for EPC General Contracting of Comprehensive Land Renovation Project in Niushou Town, Fancheng District in 2025 Construction Location: Niushou Town, Fancheng District, Xiangyang City

Construction Scale: It is proposed to carry out comprehensive land renovation in Niushou Town, Fancheng District, Xiangyang City. The renovation area of this project covers a total area of 2956.9225 hectares (44353 of 8375 mu), mainly completing five major projects, namely, comprehensive renovation of agricultural land, renovation of construction land, ecological protection and restoration, renovation of human settlements and rural industrial development.

Bidding scope: EPC is adopted for this project, including project survey, land consolidation planning and design, construction drawing design preparation, equipment procurement, transportation, installation, engineering construction, defect repair and warranty during the defect liability period, planting management and other project-related construction, procurement and services.

Bid winning information:

First place:

Consortium lead unit: China Construction Fifth Engineering Bureau Third Construction Co., Ltd.

Consortium member unit: Xiangyang Fancheng District Urban Construction Engineering Co., Ltd.

Xiangyang Xiangjiang Shouchuang Construction Engineering Co., Ltd. 0HT ML0UNK9 Zhongyuan Tianwei Group Co., Ltd. 0 HTML0 637752721.060 0 Zhongren Zhenghe Engineering Design Group Co., Ltd. 0 HTML0 637752721.060 1 Bid price (RMB): 637752721.060 HTML0 637752721.060 2 Second place: 0 HTML0 637752721.060 3 Consortium leader: China Construction Seventh Engineering Bureau Co., Ltd. 0 HTML0 UNK1 4 Consortium Members: Anhui Tongji Construction Group Co., Ltd. 0 HTML0 UNK1 5 Reliance Environment Construction Group Co., Ltd. 0 HTML0 UNK1 6 Hunan City University Design and Research Institute Co., Ltd. 0 HTML0 UNK1 7 Xiangtan Planning and Architectural Design Institute Co., Ltd. 0 HTML0 UNK1 8 Bid Price (RMB): 648032758.800 HTML0 648032758.800 9 Third Place: 0HTML0 China Construction Third Engineering Bureau 0Consortium Leader: UNK2 Group Co., Ltd. 0HTML0 UNK2 1Consortium Member: Shaanxi Zhengyi Construction Engineering Co., Ltd. 0HTML0 UNK2 2Dingzheng Architectural Design Co., Ltd. 0HTM L0 UNK2 3 Bidding Price (RMB): 646080852.900 HTML0 UNK2 4 Project Name: Public Notice of Successful Candidates of Jinhe Plaza Phase I Construction Project 0 HTML0 UNK2 5 Construction Location: North Side of Tianshan Road, Dongqiao Economic and Technological Development Zone, Ningde City 0 HTML0 UNK2 6 Construction Scale: (1) Building area Area: The total construction area of this project is 140322 ㎡, of which the construction area of the basement is 54634 ㎡, and the above-ground construction area is 85688 ㎡ (1 # commercial complex 70925 ㎡, commercial outer street 5117 ㎡, 2 # commercial office 9646 ㎡); (2) Number of floors: the first floor of the basement; 1 # commercial complex: 5 floors above the ground, commercial outer street: 3 floors above the ground, 2 # commercial office: 6 floors above the ground 0 HTML0 UNK2 7 Bidding scope: (1) Project category: housing construction engineering; (2) Bidding type: general construction contracting; (3) Bidding scope and content: including but not limited to the foundation pit support works, foundation works, main works, decoration works, curtain wall works, ventilation and air conditioning works, landscape and ancillary works, elevator works, installation works, secondary water supply equipment works, night scene works and fire protection works of Jinhe Plaza Phase I Construction Project, subject to the contents contained in the bill of quantities. Based on the construction drawings designed by Fuzhou Planning, Design and Research Institute Group Co., Ltd. Among them, the relevant data used to determine the qualification and grade of the enterprise: this project is a construction project with a construction area of 140322 square meters; the relevant data used to determine the grade of the registered constructor: this project is a construction project with a single construction area of 125559 square meters; Relevant data used to determine the performance of similar projects: This project is a civil construction project with a single building area of 125559 square meters. 0 HTML0 33000000 8 Bidding control price (i.e. Maximum bidding price limit, the same below): 573873507 yuan, of which: provisional sum UNK2 yuan 0 HTML0 UNK2 9 Construction period requirements: The total construction period is 609 calendar days, and the quota construction period is 609 calendar days (applicable to the projects with national or provincial regulations on construction period); The construction period requirements for each key node are (if any) 0 HTML0 UNK3 0 Bid winning information: 0 HTML0 UNK3 1 Bid winning candidate: China Construction First Bureau (Group) Co., Ltd. 0 HTML0 UNK3 2 Bid price: 528115608.00 yuan 0 HTML0 UNK3 3

All can be viewed after purchase
Correlation

Bid winning of the first bid section of the new Tianjin Binhai Vocational College Project-Teaching, Training and Living Quarters: China Construction Sixth Engineering Bureau Co., Ltd., bid price: 6 yuan 100943366.

2025-09-03 09:56:46

High-performance lithium battery base construction project (construction "evaluation and separation") winning bidder: China Construction First Bureau Group Southeast Construction Co., Ltd., China Construction First Bureau (Group) Co., Ltd., total bid price (yuan): 5195733398.81.

2025-09-01 10:39:28

No.187, Xinhong Road, Shuangqiaozi Street, Chenghua District, won the first bid for the design-construction general contract of the new residential project: (leader) Southwest Construction Engineering Co., Ltd. of China Construction Eighth Bureau, (member) Sichuan Architectural Design and Research Institute Co., Ltd.

2025-08-29 09:30:09

China Construction Third Engineering Bureau Group Co., Ltd., Guangdong Architectural Design and Research Institute Group Co., Ltd., Guangzhou Hi-tech Construction and Development Group Co., Ltd., Bid Price (RMB): 528546155.64.

2025-08-28 10:40:17

The bid winner of the general contract for the construction of the terminal building, the viaduct in front of the building and the ancillary facilities of Dalian Jinzhou Bay International Airport Project: China Construction Eighth Engineering Bureau Co., Ltd., China Construction Eighth Engineering Bureau Urban Construction Co., Ltd., China Construction Infrastructure Co., Ltd., and China Construction Third Engineering Bureau Group Co., Ltd., and the bid price is 4265666666.66.

2025-08-28 10:36:01

The bid winner of Longhui Garden Shanty Town Reconstruction Project (West District): China Construction First Bureau (Group) Co., Ltd., China Construction First Bureau Group South China Construction Co., Ltd., bid price (10,000 yuan): 153525, 580993.

2025-08-25 11:21:57

Successful Bidder of EPC Project of Integration of Industry and City of BOE Town: First Construction Engineering Co., Ltd. of China Construction Third Engineering Bureau.

2025-08-25 09:24:02

The new project of Sanmu Hospital of Xindu District Hospital of Traditional Chinese Medicine won the first prize: China Construction Third Engineering Bureau Group Co., Ltd., Sichuan Xide Construction Engineering Co., Ltd., with the bidding price (RMB) 750171264.80.

2025-08-20 13:50:12

Successful candidate of Jinhe Plaza Phase I Construction Project: China Construction First Bureau (Group) Co., Ltd., bid price: 528115608.00 RMB.

2025-08-18 10:29:43

China Construction Eighth Engineering Bureau Co., Ltd. won the bid for the general contract for the construction of the first phase of A-2 plot in Block 31, Cuizhai District, the starting area (RMB): 767508326.68.

2025-08-08 13:30:54

China Construction Seventh Engineering Group Co., Ltd. won the bid for the project of Zhengzhou Economic Development Zone Future Electric Power Science and Technology City, with a total investment of about 9968 million yuan (subject to the actual construction content).

2025-08-07 11:21:59

On September 5, Chairman Shao Jun of China Cement Network and his delegation visited Ningde Conch Cement Co., Ltd. and were warmly received by General Manager Hong Xianli and others. The two sides exchanged views on the situation of Fujian cement market.