Recently, according to the announcement issued by Xuchang Bureau of Industry and Information Technology of Henan Province, Yuzhou Cement of Tianrui Group has withdrawn from a 5000 t/d clinker production line, of which 2600t/d clinker production capacity is used for 4500t/d clinker production line of its shallow well branch, and the supplementary production capacity is 5800t/d; The clinker production capacity of 2400t/d is used to supplement the 10000t/d clinker production line of Zhengzhou Cement of Tianrui Group . After the supplement, the production capacity is 11200t/d, and the replacement ratio is 2:1. The withdrawal production line has been shut down in November and is planned to be dismantled and withdrawn in December 2026.
浙公网安备33010802003254号