Recently, the EPC project of Guoneng Lingshao DC supporting 2 million kilowatt composite photovoltaic base (Section 10) was held in Majiatan Town, Lingwu City, Ningxia. The DC side capacity of the
project is 200MWp, and the AC side capacity is not less than 166.67 MW. It is planned to use 285,948 monocrystalline silicon modules.
It is reported that the project is divided into 12 bid sections, with a total of 2000 MW on the AC side and 2400 MW on the DC side. As of June 16, the bidding results of all bid sections have been announced, and the winning unit price is between 1.398 yuan/W and 1.63 yuan/W.