Anqing Daguan Economic Development Zone Wanhe Infrastructure Construction Project EPC (Bid Section I)
Construction Location: Daguan District, Anqing City
Construction Scale: The main construction content of this project is divided into two parts. I. Municipal works: new Shugang Road connecting line, Wanhe Avenue, Xinguang Road, Wanhe Avenue (Caohe Road), Gangqian Road and internal road network; the above municipal works include roads, bridges and culverts, rainwater and sewage pipe network, greening, electricity, weak current integration and other related municipal infrastructure. 2. Construction part: New Anqing Daguan District Modern Logistics Park (Wanhe New Port) Project (Bid Section I). Estimated
contract price: the 88651 is RMB 4,300 yuan (including the construction and installation cost for the municipal works: RMB 2,800 yuan 58645; the construction and installation cost (including equipment purchase cost) for the building works: RMB 1,500 yuan 28757); Survey, design and special evaluation cost 12.49 million yuan)
Planned construction period: total construction period: 1090 calendar days, of which: design period: 90 calendar days, construction period: 1000 calendar days
Bidding scope: This project is an EPC project. Including but not limited to the detailed design, special design, construction drawing design (including survey, drawing review, etc.), construction drawing budget (including preparation costs) of the project; procurement, construction and whole-process construction management within the scope of construction drawings; provision of relevant design, construction technical services, construction approval services, etc. During the contract period; As well as the demonstration, review (including but not limited to environmental assessment, flood assessment, navigation assessment, energy assessment, water and soil conservation, etc.) and assessment work (including the expenses incurred) of all approval links in the whole process; until the overall handover of the project acceptance, defect repair, warranty and maintenance within the quality defect liability period. It also manages and controls the quality, safety, progress, cost, contract, information and archives within the contract period of the project.
Bid winning information:
First place: China Railway Tenth Bureau Group Co., Ltd.
Hangzhou Urban Construction Design and Research Institute Co., Ltd. (Consortium)
Bid price (RMB): 746710994.89
Second place: China Railway No.4 Bureau Group Co., Ltd.
Bid Price (RMB): 746888298.00
No.3: Anhui Construction Engineering Transportation and Shipping Group Co., Ltd.
China Communications Highway Planning and Design Institute Co., Ltd. (Consortium)
Bid Price (RMB): 74733 1586.93