On June 16, the results of public bidding for EPC project (7-12 bidding sections) of Lingwu 2 million kilowatt composite photovoltaic base project supported by Lingshao DC of Ningxia Electric Power Guoneng Lingwu New Energy Co., Ltd. were announced. The bid winning enterprises include 6 companies such as Henan Second Construction Group, with the bid winning unit price ranging from 1.398 to 1.473 yuan/W, the highest given by the China Construction Third Engineering Bureau and the lowest given by Hubei Electric Power Planning and Design Institute. Located in Baitugang Township, Lingwu City, Ningxia,
the project is divided into 12 bid sections, with a bidding capacity of 2000 MW on the DC side and 2400 MW on the AC side. The contractor's work covers construction drawing design and other contents. Previously, the bidding results of the first to third bid sections were announced on November 25, 2024, and the fourth to sixth bid sections were announced on February 17, 2025. As of June 16, 2025, the winning bidders of 12 bid sections have been confirmed.