On September 12, the Guangxi Development and Reform Commission issued the Announcement of the Development and Reform Commission of Guangxi Zhuang Autonomous Region on the Evaluation Results of the Pilot Project of Integration of Source, Network, Load and Storage. The seven listed projects are distributed in six regions, and the main body of the implementation company involves Huadian New Energy Group Co., Ltd., Nanning Trading Energy Company, State Power Investment Group Guangxi Electric Power Co., Ltd.
The original text is as follows:
Announcement
of the Development and Reform Commission of Guangxi Zhuang Autonomous Region on the Evaluation Results of the Pilot Project of Integration of Source, Network, Load and Storage In order to accelerate the construction of a new power system in our region, improve the level of clean energy utilization and the efficiency of power system operation, In accordance with the relevant requirements of the Notice on Issuing the Opinions on the Implementation of the Pilot Project for the Integrated Development of Power Sources, Networks, Loads and Storage in Guangxi (Gui Fa Gai Dian Dian [2023] No.367), the Commission organized relevant departments and third-party advisory bodies to evaluate the implementation plan of the pilot project. After evaluation and optimization, seven pilot projects of source-network-load-storage integration are now publicized. During the publicity period, if there is any objection, please submit your comments in real name and written form within the publicity period and feedback them to the Commission. Please specify the reasons and basis, and indicate the name, work unit, ID card number, address, postal code and contact information of the person who raises the comments.
Publicity time: September 12, 2023-September 18
, 2023 Mailing address: No.111-1, Minzu Avenue, Nanning, Guangxi
Contact: 0771-2328552, 2328842 (Fax)
Email: Development and Reform Commission
of Guangxi Zhuang Autonomous Region, fgwdlc@gxi.gov.cn
, September 12