On September 1, the Natural Resources and Planning Bureau of Yuhuan City announced that the mining right of granite mine for construction in the comprehensive development and utilization project of Xi'ao mining area in Jiaoxi Village, Qinggang Town, Yuhuan City, Zhejiang Province, would be sold for 7 years at a starting price of 350 million yuan. The mining area of the
project is 0.2139 square kilometers. Within the mining area, the controlled resources of granite for construction are 7.37266 million cubic meters, and the controlled resources of stone for construction (tuff) are 82606 million cubic meters. 159,140 cubic meters of ballast. The stripping volume of the covering layer is 374,130m3.
Listing time: October 7, 2023-October 20
, 2023 Starting and ending time of application: October 7, 2023-October 19
, 2023 Yuhuan City is located at the southern end of Taizhou City, bordering the East China Sea in the east and Wenling City in the north. It faces Yueqing City across Yueqing Bay in the west and consists of Chumen Peninsula, Yuhuan Island and 135 peripheral islands. The resources of building stone (tuff) are abundant, the development of building stone takes a long time, and the mineral products are all levels of gravel and ballast. According to
the Mineral Resources Planning of Yuhuan City, Zhejiang Province (2021-2025), with the mining rights of building stones put into operation year by year, the building stones in Yuhuan City will reach 12.82 million tons per year by 2025, with an average annual supply of 10.45 million tons of building stones; By 2025, the machine-made sand can reach 3.21 million tons per year, with an average annual supply of 2.16 million tons of machine-made sand, which generally meets the needs of Yuhuan's national economic and social construction.
Strengthen the development of high-quality building stone resources, promote the development of machine-made sand industry, and encourage the development of geothermal resources. The minimum resource reserves and minimum mining scale access standards for new mines shall be established, and the development of small mines shall be strictly restricted; the comprehensive development and utilization of mining land and the mining right projects for the treatment of abandoned mines may not be restricted by the minimum mining scale, but they shall be scientifically demonstrated. It is strictly forbidden to exploit mineral resources in the name of engineering construction on the premise that mining rights should be obtained according to law but not obtained.
By 2025, the total number of mining rights in Yuhuan City will be controlled at 5, and the number of building stone mining rights will be controlled below 5. Strengthen the index management of mining rights, coordinate the cancellation with the new mining rights, and strengthen the construction of large stone mines. The annual production scale of mines in the provincial centralized mining area is ≥ 3 million tons, the annual production scale of mines in the municipal centralized mining area is ≥ 2 million tons, and the proportion of large and medium-sized mines is 100%. Actively and steadily promote the construction of "machine-made sand" mines to meet the self-sufficiency of construction sand in Yuhuan City.
Provincial sand, gravel and soil centralized mining areas coordinate the guarantee of key projects at provincial and municipal levels, the guarantee of stone supply for major projects, and municipal sand, gravel and soil mineral centralized mining areas coordinate the guarantee of stone supply for infrastructure construction in the city.
In the north of Yuhuan City, the provincial centralized mining area (CS01) for construction stone in Shamen- Yucheng Street of Yuhuan City will be set up, with an area of 90.00 km ², 3 mining rights to be set up, and an annual production scale of 10.2 million tons. It is planned to build a large-scale stone production and processing base in the whole industrial chain of stone mining, machine-made sand processing, concrete and prefabricated parts production.
In the south of Yuhuan City, Yucheng Sub-district-Damaiyu Sub-district city-level construction stone ore centralized mining area (CS02) is set up, with an area of 43.74 km ², 2 mining rights are planned to be set up, and the annual production scale is 6.6 million tons. It is planned to build a base for stone mining and processing and machine-made sand production.