Recently, it has been reported that the price of construction sand in Dongguan City, Guangdong Province has risen sharply, with a cumulative increase of about 80 yuan per square meter since September. Digital building materials investigated some sand and gravel manufacturers in Dongguan City.

According to the manufacturer's feedback, the price of sand and gravel in Dongguan has indeed risen recently, but as far as ordinary machine-made sand is concerned, the price increase is far less exaggerated than 80 yuan per square meter, and the actual increase is about single digits. At present, the price of machine-made sand is about 90 yuan per ton.
A sand and gravel dealer told Digital Building Materials that the current round of price increases in Dongguan is mainly affected by the rise in freight rates. The Xijiang River is the most convenient water transport artery connecting Guangdong, Hong Kong and Macao, and a large amount of sand and gravel flows to the Guangdong market through the Xijiang River waterway. Since the Xijiang River entered the dry season, the water level in the upper and middle reaches has dropped, the ships have reduced their load, and the transport capacity is relatively tight, which has led to the increase of freight. In terms of
market demand, Dongguan has successively started construction of key projects since the Golden Nine Silver Ten, but the recent epidemic prevention and control situation in Dongguan is grim, the pace of project construction has slowed down, and the overall demand for sand and gravel is weak.
A manufacturer also feedback to digital building materials, at present, upstream and downstream enterprises are under great financial pressure, mixing stations are tight, not active in taking goods, this year the whole industry is very difficult.
浙公网安备33010802003254号