News List

On December 6, Chuanneng Power announced that the board of directors had recently received a written resignation report from Wan Peng, vice chairman, director and general manager of the company. Due to job changes, Wan Peng applied to resign as vice chairman, director, general manager and special committee of the board of directors of the company. His original term of office ended on November 15, 2027.

2025-12-08

This week, the price reduction of photovoltaic market has stalled, and the end of the year may usher in a new round of low price crushing.

2025-12-08

According to the incomplete statistics of the Digital New Energy DataBM. Com, the capacity of the announced photovoltaic modules bidding and shortlisted projects in two weeks (11.22-12.05) was about 19.47 GW, and the total amount of photovoltaic modules bidding projects was about 33.96 GW.

2025-12-08

The bidding agencies of the two projects are Hunan Zhongkai Zhongtuo Project Management Consulting Co., Ltd.

2025-12-08

On December 2, China Power Construction Yunnan yuanmou Longshan Village Photovoltaic Power Generation Project (Bid Section 1) was officially started.

2025-12-08

On December 6, Oujing Science and Technology announced that the date of reaching the expected usable state of its project "Ningxia Quartz Phase II Project" was postponed to December 31, 2027.

2025-12-08

Recently, according to the information of relevant property rights trading platform, the related assets of clinker production line held by Xinjiang Hejing Tianshan Cement Co., Ltd. were transferred at a base price of 6.194 million yuan.

2025-12-08

Recently, according to the information of relevant asset trading platform, Longrui Cement, Dakang Town, Jiangyou City, Sichuan Province, transferred the mining right of limestone mine with a starting price of 10.8388 million yuan.

2025-12-08

On December 5, Tianshan Stock Company announced that its subsidiaries had found differences in tax-related compliance in the recent enterprise tax self-examination, and that they needed to pay a total of 61.8558 million yuan in taxes and late fees.

2025-12-08

According to the announcement of Hongying Intelligence on December 4, the company's subsidiary company jointly won the bid of "Luopu 500000 kW/2 million kWh energy storage supporting 2 million kW photovoltaic power generation project (EPC general contract)", which was terminated due to the announcement of the abolition of the bidding result by Xinjiang Tongguang Science and Technology Co., Ltd., the bidding unit of the project. The reason for the abolition is a major policy adjustment, which will be re-tendered after the adjustment of the plan.

2025-12-06

On December 5, the tender announcement of Yunnan Baihe Village Photovoltaic Power Generation Project (EPC) was issued.

2025-12-05

On December 5, Tianyang New Material announced that it intends to terminate the follow-up investment of "Nantong Photovoltaic Film Project" and "Haian Photovoltaic Film Project" in the non-public offering fund-raising investment projects in 2022, and use the remaining 28323 of the two projects to raise funds for new projects.

2025-12-05

According to the announcement of Hongying Intelligence on December 4, the "Luopu 500000 kW/2 million kWh energy storage supporting 2 million kW photovoltaic power generation project (EPC general contracting) of Xinjiang Tongguang Science and Technology Co., Ltd.", which was jointly won by the company's subsidiaries, has been abolished by the bidding unit Xinjiang Tongguang Science and Technology Co., Ltd. due to major policy adjustments.

2025-12-05

Digital New Energy DataBM. Com learned that on December 2, a new energy project with a total scale of 1.55 million kilowatts was formally signed in Xingxian Economic and Technological Development Zone, Luliang City, Shanxi Province.

2025-12-05

On December 5, the State Energy Group Changyuan Electric Power Co., Ltd. (Hereinafter referred to as "Changyuan Electric Power") announced that it had decided to adjust the construction capacity and investment amount of its three photovoltaic projects.

2025-12-05

On December 5, the National Cement Price Index (CEMPI) closed at 101.71 points, down 0.1% annually and 23.82% year-on-year. On December 5, the Yangtze River Basin Cement Price Index (YRCEMPI) closed at 93.71 points, up 1.36% from the previous month.

2025-12-05

Sichuan and Chongqing: This week, the concrete market in the main city of Chongqing showed a weak and stable operation trend, the terminal demand performance was flat, and the inventory of some raw material enterprises continued to be in a high state of operation.

2025-12-05

This week, the cement market demand in Northwest China is weak.

2025-12-05