News List

Intelligence is no longer a choice question of "icing on the cake", but a "necessary question" concerning the survival and development of enterprises.

2026-07-10

On the whole, this round of provincial state-owned assets integration has both long-term and short-term value. In the short term, it will optimize the layout of regional cement production capacity and consolidate the basic position of Conch Cement's main business. In the long term, it will rely on the stable new material profit increment of Wanwei Hi-Tech to create the second growth curve for Conch Group and build an anti-cyclical diversified profit system.

2026-07-10

The weekly industry news snapshot focuses on key industry developments from June 29 to July 3, 2026, covering policy releases, market trends, technological breakthroughs and major events, aiming to provide a timely and concise overview of industry information.

2026-07-10

By the end of 2025, the total production capacity of industrial silicon in China was about 7.879 million tons. The new production capacity mainly comes from the preliminary planning of project production and the layout of integrated enterprises, mainly polysilicon and organic silicon related integrated enterprises. Production capacity is still concentrated in the northwest and southwest regions, accounting for 79.9% of the total.

2026-07-10

The scale of the global and China's silicon wafer industry contracted year on year, reflecting the periodic imbalance between supply and demand in the industry and the pressure of capacity adjustment.

2026-07-10

BYD won 11.275 GWh energy storage orders in the Middle East, providing support for the world's first GW-class all-weather renewable energy project, demonstrating its global leading strength in energy storage technology.

2026-07-09

The "Fifteenth Five-Year Plan" Action Plan for Carbon Peak clearly takes the green and low-carbon transformation of energy as the key, promotes the transformation of industrial structure, key areas and supporting systems as a whole, ensures that carbon peak is achieved by 2030, and lays a solid foundation for carbon neutrality.

2026-07-09

On June 30, the Bureau of Ecology and Environment of Urumqi, Xinjiang, issued a public announcement on the approval decision of the EIA document for the 2 million kilowatt photovoltaic project in Midong District, Hongqiao, Beijing.

2026-07-09

According to foreign media reports, EuroCZ Factory, a project supported by the European Union to enhance the manufacturing capacity of silicon ingots and wafers in Europe, was launched recently.

2026-07-09

On July 8, Chuneng New Energy and KK Group of Denmark signed a strategic cooperation agreement at Chuneng Global Headquarters.

2026-07-09

On July 7, Guangdong Energy Group issued a tender announcement for the second batch of centralized bidding and procurement projects for photovoltaic modules in 2026.

2026-07-09

Major enterprises in the Pearl River Delta region of Guangdong plan to raise the price of cement by 30 yuan/ton from July 10, and the specific implementation needs to be followed up.

2026-07-09

On July 7, the Development and Reform Commission of Lujiang County, Anhui Province, issued a notice on the clean-up of long-term distributed photovoltaic projects in Lujiang County.

2026-07-09

On July 6, Jiangsu Huadian Yancheng Honggang 390 MW Fishing-photovoltaic Complementary Photovoltaic Power Generation Project was announced to have won the bid for EPC general contracting.

2026-07-09

The total amount of calibration in June was 9.26 GW, an increase of 41.43% compared with May, showing the characteristics of surface warming. At the price level, the average price of 0.752 yuan/W in June fell by 10.73%, and the previous upward momentum was temporarily interrupted.

2026-07-09

The two sides reached a preliminary cooperation intention, and planned to rely on the existing clinker production line to carry out expansion investment, revitalize the stock capacity, link the surrounding chemical raw material resources, reduce costs and increase efficiency, and simultaneously ensure the stable employment of the original workers.

2026-07-09

Digital New Energy DataBM. Com learned that on the evening of July 8, Atlas responded to the Shanghai Stock Exchange's information disclosure regulatory inquiry letter on the 2025 annual report, mainly focusing on the company's main business operation, business adjustment and competition in the same industry, asset impairment losses and other aspects.

2026-07-09

In June 2026, the temperature in the northern region was relatively high, while the rainy weather in the southern region was affected by the Meiyu, and the downstream demand continued to be depressed due to the influence of the high school entrance examination and the busy farming season. The off-season characteristics were obvious, coupled with the high inventory of enterprises, the peak staggering efforts were still large, and the capacity utilization rate continued to be at a low level.

2026-07-09

Mass production import data show that ACM technology increases mass production conversion efficiency by 0.2% -0.3% and module power by 3-5 watts.

2026-07-09

Recently, Liu Yu, Party Secretary and Chairman of BBMG Jidong Cement Group Co., Ltd., and his delegation visited China Cement Network and were warmly received by Shao Jun, Chairman of China Cement Network. The two sides had in-depth exchanges on current hot issues in the cement industry.