I. The basic information
of the project is based on the relevant provisions of the Measures for the Implementation of Capacity Replacement in the Cement and Glass Industry (2024 edition) and the Detailed Rules for the Implementation of the Management of Cement Capacity Replacement in Shandong Province. The target includes complete integrated industrial chain production capacity: 600t/d special clinker firing capacity (annual clinker production capacity of 180,000 tons), supporting 400,000 tons/year special cement finished product grinding capacity, complete matching of kiln line + grinding line, indicators can be split and transferred as a whole, which fully meets all the legal and rigid conditions for capacity replacement within and across provinces.

2. Core highlights
of the project 1. Exclusive production capacity of special cement, scarce policy and strong
adaptability to landing (1) Category differentiation advantage: different from the production capacity of ordinary Portland cement clinker, this subject is a special production capacity index of special cement, with less restrictions on replacement policy. It can be used for sub-divided special building materials projects such as sulfate-resistant cement, dam cement, oil well cement, road special cement, etc.
(2) Complete closed loop of production capacity: clinker firing kiln line + supporting finished product grinding double-line matching, bidders do not need to purchase additional clinker production capacity matching after acquisition, and a single set of indicators can support the landing of complete special cement production projects;
(3) The examination and approval procedures are complete, all qualification certificates are within the validity period, and the core host of the equipment is completely dismantled before the original production capacity is withdrawn.
2. The territorial policy process is clear, and both intra-provincial and inter-provincial replacement is possible
. (1) The subject territory is Zhangqiu District of Jinan City, the standardized management area of cement production capacity in Shandong Province. The declaration process of capacity replacement of municipal and district industry and information departments is standardized, and the processing cycle is transparent and clear;
(2) The indicators also support the two operation modes of replacement within Shandong Province and inter-provincial and off-site replacement. The ratio of clinker replacement in key areas of air pollution prevention and control is 2:1. Special cement is classified and accounted separately, and does not occupy the replacement quota of general cement.
Contact number: Manager Yang, 13001735477?
浙公网安备33010802003254号