Shandong Beijing-Hangzhou Multimodal Transport Logistics Project Supporting Railway Special Line Reconstruction and Expansion Project (Phase II), which was announced recently. The project is located in Liangshan County, Jining City, with a total investment of about 540 million yuan. A bulk coal operation area and a container operation area will be built on the west side of the park. The total effective length of the railway line is 1,700 meters. The project aims to achieve seamless connection between the Wari Railway and the Beijing-Hangzhou Canal, and is scheduled to start construction in June 2026 and be completed in July 2027.
[Project Name] Shandong Beijing-Hangzhou Multimodal Transport Logistics Project Supporting Railway Special Line Reconstruction and Expansion Project (Phase II) Construction Lump Sum Contracting
[First Bid Winning Party and Quotation] Shandong Jinan Railway Engineering Construction Group Co., Ltd.: 540,067, 700.00 yuan (540.0677 million yuan/about 540 million yuan)
[Basic information of the project] The project is located in Liangshan County, Jining City, Shandong Province, with a total investment of about 540 million yuan. The content of the project is to build a new bulk coal operation area and container operation area on the west side of the park, including the construction of several railway lines, with a total effective length of 1,700 meters, covering all construction contents such as demolition and land acquisition, subgrade, bridge and culvert, track, communication signal, power supply, etc. It is planned to start construction in June 2026 and complete in July 2027, with a construction period of about 13 months. The project aims to realize the seamless connection between the Wari Railway and the Beijing-Hangzhou Canal, and to improve the efficiency of multimodal transport logistics.
浙公网安备33010802003254号