On May 20, Zhuoyang Energy Storage and Saudi Arabia's local strategic partners jointly built the first world-class battery energy storage manufacturing base in Saudi Arabia. The first phase of the project has a planned capacity of 6 GWh, which will be completed and put into operation in the first quarter of 2027, and the second phase will be rapidly expanded to 18 GWh.
The base covers an area of 150 mu, and its products will be certified as "Made in Saudi Arabia" according to the top European manufacturing standards, fully adapting to the technical specifications of the local power grid, and radiating the markets of the six Gulf countries, the Middle East, North Africa, Central Asia and Africa.
With the acceleration of energy transformation in Saudi Arabia , the installed capacity of energy storage in the country is expected to reach 33.5G Wh in 2026, ranking the third largest incremental energy storage market in the world.
浙公网安备33010802003254号