Project Name: Longgang Second Bridge Area Urban Organic Renewal Project (Phase I) Comprehensive Development Bid Announcement
Bidding Content: Agent Construction Project: Including Resettlement Housing Plot JW-H-02, JW-H-04 Plot, Park Green Land Plot JW-D-02 (Jiangbin Post Station). JW-D-02 a and 02 B plots (religious sites and commercial land), the total investment of the above projects is about 892.76 million yuan.
The details are as follows: (1) Plot JW-H-02: the plot will be allocated for construction in advance, and will be transferred for consignment in the later period. The plot will be built on consignment. The underground parking garage of Plot JW-H-04 can be set up as a whole and allowed to be connected underground. The underground space of Xindu Street will be used for parking allocation. The area is about 36.63 mu, the plot ratio is 2.7, and the capacity building area is 65936. (2) Plot JW-H-04: The plot is allocated for indemnificatory housing, with an area of about 72.72 mu and a plot ratio of 2.8, of which 62. (4) JW-D-02a, 02b (religious sites and commercial land), JW-D-02a plot is a religious land with an area of about 5.27 mu. It is planned to build Fangyan Church (1908 square meters) and Binjiang Church (731 square meters), with a plot ratio of 0.8 and a capacity area of 2812.8 square meters; Plot JW-D-02b covers an area of about 7.29 mu. It is planned to build a commercial building with 1-2 floors along the street, with a plot ratio of 1.05 and a capacity area of 5104. Industrial investment projects: including residential land in Plot JW-D-04 and commercial and residential land in Plot JW-D-06, as follows: (1) Residential land in Plot JW-D-04. The area is about 45.52 mu, and the plot ratio is 2. Plot JW-D-06 for commercial and residential use, with an area of about 17.84 mu, a plot ratio of 3.5, a building height of less than 100 meters, and a construction area of 41618.
Bidding scale: 1. Plot JW-D-02 (Jiangbin Post Station), Plot JW-D-02a and Plot JW-D-02b (religious sites and commercial land), the total investment of the above projects is about 892.76 million yuan. Industrial investment project: residential land of Plot JW-D-04 (about 45.21 mu), Commercial and residential land of JW-D-06 Land Parcel (about 17)
Bid winning information:
Bid winning company: China Railway Construction Group Co., Ltd.
Wenzhou yuanfeng Real Estate Co., Ltd.
Zhejiang Greentown Jiayuan Construction Engineering Management Co., Ltd.
Wenzhou Wanfengjian
China MCC17 Group Co., Ltd.
Zhejiang University Architectural Design and Research Institute Co., Ltd.
Bid winning amount: 89276.
Bid winning information:
First place: China Railway 16th Bureau Group Electrification Engineering Co., Ltd. Bid Price of Limited Company
: 112683123.85 yuan
Second Place: Hunan Jinsen Electric Power Construction Group Co., Ltd.
Members of the Consortium: Zhongzheng Jiantou (Guizhou) Construction Engineering Co., Ltd
. Bid Price: 113044976.
Third place: Bainian Construction Group Co., Ltd.
Bidding price: 112773586.
Construction scale: The land area of the project is 34474 square meters, and the total construction area is 32600. 99 ㎡ (aboveground: 31415. 05 ㎡, Underground: 1185.
Bid winning information:
First place: Hengxin Construction Engineering Co., Ltd.
China Railway 25th Bureau Group Co., Ltd.
Bid quotation (RMB) 159,634. 286.38
Second place: Guangdong Shengjian Construction Co., Ltd.
Bid quotation (RMB) 159,216,085.43
Third place: Shaoguan State Construction Engineering Co., Ltd. Bid
quotation (RMB) 154,746. 221.66
Project Name: Announcement of
Successful Candidates for the Construction of the New Project of the Second People's Hospital of Gu'an County The total investment of this project is 72895, of which the estimated price of the construction and installation works is 39812.
The total land area is 39999. The main construction contents include 62306 square meters of the comprehensive medical building, 1600 square meters of the fever clinic building, and 640 square meters of auxiliary rooms (480 square meters of the garbage station and sewage treatment station, 70 square meters of the temporary storage room for medical wastes, 40 square meters of the liquid oxygen station, and 50 square meters of the guard room). At the same time, outdoor pipeline network and other supporting projects will be constructed.
Construction site: in the middle of Hot Spring Business Industrial Park of Gu'an County, west side of Zhongnan Jingliu Road and north side of Zhongnan Weisan Road. The maximum bidding price of this
tender is 39812. The 571694 is ten thousand yuan
. The planned construction period is: 720 calendar days
Bid winning information:
No.1: China Railway 23rd Bureau Group Co., Ltd.
Bid offer (RMB): 377421228.99
No.2: China Construction Third Engineering Bureau Group Co., Ltd.
Bid offer (RMB): 378498117
No.3: China Railway 11th Bureau Group Co., Ltd.
Bid Price (RMB): 379015766.76
Project Name: S211 Tongxiang-Dongtou Highway Jinyun Dongfang-Shuhong Section Project First Contract Section Letter of Acceptance 0 HTML0U NK14 Project overview: The starting point of the route is located at the north side of Jingyue Village in Dongfang Town, crossing with Provincial Highway 209 at the same level, with the starting stake number of K0 + 000. The route is routed to the southeast, crossing the Haoxi River through the Jingyue Bridge on the east side of Jingyue Village, crossing the Haoxi River and Xianjing Line to the east side of Shangzhang Village through the west side of Hutadi Village, and then turning to the southeast to cross the valley along the village road. Wuyanxia Tunnel is set to Wuyanxia Village. The route continues to the south along the foot of the mountain. After passing the west side of Panlong Village, the route turns to the southwest and is laid along the village road to Shuhong Town. The end point crosses the Pinghuang Highway at the same level. The end point stake number is K11 + 390. The total length of the route is 11.390 km; For the reconstruction and utilization section of Zhenzhong Road in K10 + 880-K11 + 390, the current subgrade width is 19 m, the length of the reconstruction and utilization section is 0.0 HTML0, the total length of the UNK1 5 is 11.390 km, 4 bridges (4 bridges of 990.29 m) and 35 culverts of 718.23 m are set. Including 27 pipe culverts of 542.241m, 6 slab culverts of 138.87m and 6 box culverts of 37.0 HTML0 75138. Of which, the construction and installation fee is 40843.0 HTML0 40843 7 Technical standard: adopt the technical standard of Class II highway with two-way two lanes in the Technical Standard of Highway Engineering (JTGB01-2014), the design speed is 60 km/H (40 km/H in some sections through the town), the roadbed width is 12 meters, and the net width of the tunnel is 12 meters. Bridge width 11. The design load grade of bridges and culverts shall be Grade I of highway. Other technical indicators shall be implemented in accordance with the provisions of the current relevant industrial technical standards and specifications, and shall meet the relevant provisions of the Compulsory Provisions of Engineering Construction Standards (Highway Engineering) of the People's Republic of China. 0HTML0 UNK1 8 Bidding scope: 0HTML0 UNK1 9 Bid section division: According to the terrain along the line, the project budget and other conditions, The contract section of the project is divided into two contract sections after comprehensive consideration: the first contract section: civil works of K0 + 000 ~ K11 + 390 (including subgrade, pavement, bridge, culvert, tunnel (including electromechanical embedded parts), level crossing and other works) and greening landscape; The second contract section: traffic engineering, facilities along the line and tunnel electromechanical engineering of K0 + 000 ~ K11 + 390. The schedule is as follows: 0 HTML0 UNK2 0
Project Name: Bid Sections II and IV of Reconstruction Project of Old Block of Start-up Square in Cuiping District, Yibin City (planned widening and reconstruction project of Heng'er Road,
Construction site: Anfu Street, Cuiping District, Yibin City, Sichuan Province
Project scale: The construction content of this project is to transform 134,312 square meters of old blocks and 171,000 square meters of residential areas along the street; Renovation of 21,300 square meters of public service facilities; Total
Project Investment and Sources of Funds: The total project investment is 900 million RMB yuan, including 0.29 million RMB yuan for 66759 and 0.69 million RMB yuan for other 19668. The reserve fund is 3572.
The second bid section mainly widens and reconstructs the planned Heng'er Road on the north side of the A-02-15 plot of Jiuzhou Group, with A length of about 160. The fourth bid section mainly upgrades and reconstructs the area along the river from the starting square to Jiuzhou Tower, with A length of about 7 kilometers. It includes improving the important nodes of Minjiang waterfront landscape belt, cycling greenway, greening, public facilities, supporting landscape, improving the functions of riverside ecological landscape, upgrading the supporting facilities and enhancing the image.
Bid winning information:
First place: China Railway 23rd Bureau Group Co., Ltd.
Yibin Sanding Construction Engineering Co., Ltd.
Bid price (RMB): 77894165.86
Second place: China Railway 19th Bureau Group Co., Ltd.
Bid Price (RMB): 77894165.86
No.3: China Railway Shisiju Group Co., Ltd.
Bid Price (RMB): 77894165. Construction Scale: Newly-built Class I pipe network of the project (maximum pipe diameter DN500) approx. 24.31 km, The secondary pipe network is about 47.88 kilometers, totaling 72.
The total investment of the project is about 8070. Among them, the cost of construction and installation is about 6592.
The information of winning the bid:
the first place: the Second Engineering Co., Ltd. of China Railway 17th Bureau Group (main)
Hainan Tianmei yuanhuan Environmental Protection Equipment Engineering Co., Ltd. (Cheng)
Total price: 62363199.59 (yuan)
Second place: Fujian Dongshenghong Engineering Construction Co., Ltd. (Main)
Shenzhen Wenda Environmental Technology Co., Ltd. (Cheng)
Total price: 61858496.58 (yuan)
No.3: Shenzhen Yuesheng Construction Group Co., Ltd. (Host)
Guangdong Tianchen Environmental Engineering Co., Ltd. (Member)
Total price: 62458191. The main construction contents are as follows:
(1) 254.583 km of supporting pipelines are laid, including 89.245 km of de20 household PE pipes, 153.201 km of de40 ~ de160 PE pipes, and 6.376 km of D N200PE pipes. DN300PE pipeline 5.
(3) Construct 3 pipeline booster pump stations and 4 new small centralized water supply plants.
Bidding scope: mainly for the construction of centralized water supply consolidation and upgrading project in Nanshan Town, Jiexi County. For details, please refer to the preliminary design and relevant data provided by the Tenderee.
Bid winning information:
First place: China Railway 20th Bureau Group Co., Ltd.
Bid price: 49268293.
Second place: China Railway Shisiju Group Co., Ltd.
Tender offer: 48949071.18 yuan
Third place: China Railway Shisiju Group No.5 Engineering Co., Ltd
. Tender offer: 48752839. The first phase covers an area of about 110 mu. The new commercial complex for new energy vehicles is about 46000 square meters, the delivery center is about 5,000 square meters, the 4S shop is about 26000 square meters, and the underground parking room is about 21000 square meters. The second phase covers an area of about 100 mu, and the new production plant for customized new energy vehicles is about 80,000 square meters, and the supporting rooms are about 10000 square meters. The construction content of this bid section is Phase I. Estimated total investment and fund source of the
project: the construction cost of this bid section is about 45000. Source of project funds: Self-raised by
the enterprise Bid winning information:
First place: The Sixth Engineering Co., Ltd. of China Railway Wuju Group
Bidding price (RMB): 360186698.54
Second place: Sichuan Zhisheng Construction Group Co., Ltd. 0H TML0UNK9 Bid Price (RMB): 360186698.540 HTML0 360186698.540 0 Third Place: Sichuan Chengfei Construction Engineering Co., Ltd. 0 HTML0 360186698.540 1 Bid Price (RMB): 360186698. The intersection angle between the new bridge and the central line of the railway is 55 °, and the oblique intersection is normal. Construction scope: KO + 170 ~ KO + 897.230, the new bridge is divided into sections. The left bridge span combination is: (3 × 30) m cast-in-situ continuous box girder + (3 × 30) m cast-in-situ continuous box girder + (3 × 30) m cast-in-situ continuous box girder + (96 + 118) m partial cable-stayed bridge + (30 + 47 + 28 + 25). The right (inner) bridge span combination is: (3 × 30) m cast-in-situ continuous box girder + (3 × 30) M cast-in-situ continuous box girder + (2 × 30 + 22) m cast-in-situ continuous box girder + (42 + 45 + 34.6) m steel box girder + 19. The upper structure of the overpass railway is a T-shaped continuous girder stiffened by rotating stay cables, with a left span of (96 + 118) m and a right span of (115 + 96) m. There are 6 tracks across Guangzhou-Shenzhen Railway and Guangguan-Shenzhen Intercity Railway. The minimum vertical distance between the beam bottom and the railway rail is 11.0 m, the total width of the bridge deck is 60.76 m, and the width of the left and right bridges is 30.13 m. The main pier of the cable-stayed bridge with substructure part adopts solid pier pile foundation, and the connecting pier adopts column pier pile foundation. The horizontal distance between the left main pier bearing platform edge and the center line of the nearest railway track is 14.68 m, and the horizontal distance between the north side pier bearing edge and the center line of the nearest railway track is 25.6 m; The horizontal distance between the edge of the right main pier cap and the center line of the nearest railway track is 26.65 m, and the horizontal distance between the edge of the south side pier cap and the center line of the nearest railway track is 7.0 HTML0 UNK1 2. Construction scope FKO + 000 ~ FK0 + 556.0 HTML0 UNK1 3 The implementation contents include bridge works (including approach behind abutment), lighting works, drainage works, traffic works, greening, sound barrier works, etc. The specific scope of the agent construction project shall be subject to the approved construction drawings. 0 HTML0 UNK1 4 Main technical standards: The grade of the road on the bridge is first-class highway and urban trunk road, the design driving speed is 60km/H, and the deck layout is two-way six lanes on the main line + two lanes on each side of the auxiliary road + sidewalk. 1. 0 HTML0 222363 is adopted for the vehicle load at the overpass of the railway. Project investment and construction period: The total investment of the project is 6,100 yuan UNK1. The maximum bidding price for the construction bidding of the project is 19,360 yuan 35029, of which the safety production fee is 514.0 HTML0 UNK1. The construction period of the project is 660 calendar days. 0 HTML0 34500 7 Bid winning information: 0 HTML0 UNK1 8 No.1: China Railway No.6 Engineering Group Co., Ltd. 0 HTML0 UNK1 9 Bid price (RMB 10,000): 34500.25280 HTML0 25280 0 No.2: China Railway No.4 Engineering Group Co., Ltd. 0 HTML0 UNK2 1 Bid price (RMB 10,000): 3444 0. 69870 HTML0 34342 2 No.3: China Railway 15th Bureau Group Co., Ltd. 0 HTML0 UNK2 3 Bid Price (RMB 10,000): UNK2. 62140 HTML0 UNK2 4 Project Name: Jianggao Town Beautiful and Livable Village Construction EPC Project 0 HTML0 UNK2 5 Project Location Jianggao Town, Baiyun District, Guangzhou 0 HTML 0 UNK2 6 Construction Scale: It is planned to construct the roads in Nanpu Village, Daling Village, Xiongfeng Village, Wufeng Village, Liangshang Village, Liangxia Village, Shalong Village, Guotang Village, Langtou Village, Julong Village, Dashigang Village, Zhongba Village, Jinggang Village, Luoxi Village and Xiashi Village. The main content is to harden, repair and pave asphalt on the existing roads in the village. The total length of the roads is about 21.The total investment of this
project is 34.008 million yuan, including 27.5257 million yuan of engineering cost and 3.9565 million yuan of other construction costs. Reserve fund 251.
Bid winning information:
First place: (host) China Railway Erju Group Co., Ltd.
(Chengdu) Construction Survey Co., Ltd.
(Chengdu) China Railway Erju (Guangzhou) Engineering Co., Ltd.
(Chengdu) Zhonglianchuang Design Co., Ltd.
Bid Price: 28589600.00 yuan
Second Place: (Host) Guangdong Guanglin Construction Group Co., Ltd.
(Cheng) Guangdong Geotechnical Engineering Investigation Institute Co., Ltd.
(Cheng) Zhongen Engineering Technology Co., Ltd.
Price: 28688800.00 yuan
Third Place: (Host) Guangzhou Yueshou Construction Engineering Co., Ltd.
(Cheng) Zhongbei Engineering Design Consulting Co., Ltd.
Bid Price: 28838700. The central heating area is 178,000 ㎡, and there are 196 single buildings in total. Heating load 9799. Heating pipe network diameter DN350-DN40, route length: 33. New indoor heating building area 17. Energy-saving renovation area about 10.
Bidding scope: This project is an EPC + O project, including construction drawing design, construction approval, material and equipment procurement and equipment installation and commissioning. Construction within the scope of construction drawings, defect repair and warranty during the defect liability period and warranty period, operation and maintenance related to the project during the operation period, and management and control of quality, safety, progress, cost, contract and information of the project.
Design scope: including but not limited to the construction drawing design of the contents determined in the preliminary design, the later construction and the relevant acceptance coordination work, etc.;
Construction scope: including all works related to the project, including but not limited to all professional works and ancillary supporting works within the scope of design drawings and other supporting functions of the project; Scope of
equipment purchase: including but not limited to building materials and equipment, facilities and equipment that are integral to the project, and other equipment included in the scope of this purchase;
scope of operation: operation and management during the operation period, and undertaking corresponding interest dividends and providing jobs. Note: The Tenderee has the right to partially adjust the scope of works directly constructed by the General Contractor and the scope of temporarily estimated materials and equipment during the bidding process or during the execution of the contract according to the planning adjustment and the actual situation of the project, which shall not be deemed as the Tenderee's breach of contract, and the Tenderer shall not have any objection to this and shall not require the Tenderee to bear the liability for breach of contract. Requirements
for construction period: This project is an EPC + O project, and the total construction period of the contract is 150 calendar days (excluding the winter break).
Operation period: 3 years (calculated after the completion and acceptance of the project); subject to the signing of the contract.
Bid winning information:
Bid winner: China Railway First Group Co., Ltd.
Zhongyu Engineering Group Co., Ltd.
Shandong Yirun New Energy Technology Co., Ltd.
Bid winning price: 207188812 yuan
Project Name: Announcement of
Bid-winning Results of the Over-railway Project on the Newly-built Zhuji Road Project Address: Fenghuangtai Subdistrict Office, Zhifu District, Yantai City, which starts from the planned Zhuji North Road in the north and ends at Fenghuangtai Road in the south.
Construction scale of Zhuji Middle Road, Zhuji South Road, Lanyan Railway and Zhichu Road: the new Zhuji Road overpass railway project, with a total length of 1413 meters. The bridge of the non-railway section of Zhuji Road is 715 meters long (422 meters north of Zhuji Station and 293 meters south of Zhuji Station), and the ground road under the bridge is 1129 meters long (665 meters from Zhuji North Road to Zhuji South Road and 464 meters from Chu Road to Fenghuangtai Road). The intersections along the line are included in the reconstruction of non-railway sections of the project, of which the reconstruction scope of Fenghuangtai Road is 364 meters long and that of Zhuji Middle Road is 264 meters long. The grade of Zhuji Road is urban trunk road, and Fenghuangtai Road is urban secondary trunk road. The main contents include road traffic engineering, bridge engineering, drainage engineering, lighting engineering, monitoring engineering and landscape engineering.