China Railway 11th Bureau, China Railway 23rd Bureau, China Railway 5th Bureau and China Railway 19th Bureau won the bid for new projects

2026-01-26 13:15:00

(1) Rectify and renovate the disordered and staggered points of the 15 hm ² drainage system in Dianbai District, renovate the drainage pipe network of 300 km in the area, repair 30 km of defective drainage pipes, and repair and renovate 2 km of structurally damaged drainage culverts; (2) Build 15 km of new drainage pipes and set 200 drainage outlets; (3) Renovate 8 waterlogging-prone water accumulation points in Dianbai District and build 2 new drainage pumping stations. (4) Reconstruction of drainage pipe network in the area of Haibin Avenue (east side of Sengao Flood Drainage Channel).

Project Name: Dianbai District Urban Drainage Pipe Network Construction and Reconstruction and Waterlogging Control Project (Phase II) Project General Contracting

Construction Location: Dianbai District, Maoming City

Project Overview: (1) To sort out and renovate the chaotic and staggered points of the 15 hm ² drainage system in Dianbai District. 300km of drainage pipe network in the area shall be renovated, 30km of defective drainage pipes shall be repaired, and 2km of damaged drainage culverts shall be repaired and renovated; (2) 15km of new drainage pipes shall be built, and 200 drainage outlets shall be set; (3) 8 waterlogging-prone water accumulation points in Dianbai District shall be renovated, and 2 drainage pumping stations shall be built. (4) Reconstruction of drainage pipe network in the area of Haibin Avenue (east side of Sengao Flood Drainage Channel). The estimated total investment of this

project is 29220. The construction and installation cost of this project is 24045.

The planned construction period is 395 calendar days, of which: (1) the design period is to complete the construction drawing design within 30 calendar days after the contract is signed; (2) Construction period: 365 calendar days, and the specific commencement time shall be subject to the commencement notice issued by the Supervisor.

Highest bidding price (RMB 10,000): 24377.

Information of winning the bid:

First place: China Railway 11th Bureau Group No.5 Engineering Co., Ltd.

Shanghai Municipal Engineering Design and Research Institute (Group) Co., Ltd.

Guangdong Construction Engineering Group Tender Offer for Joint Stock Limited Company

: 242874898.64 yuan

Second Place: China Railway Shanghai Engineering Bureau Group Co., Ltd.

Jiangsu Jiaoke Group Co., Ltd

. Tender Offer: 240157373.40 yuan

Third place: China Railway 22 Bureau Group Co., Ltd.

Tender offer: 243000162.

Planned construction period: Bid Section I (EPC general contracting, Including equipment) Construction period: 500 calendar days (the specific commencement date shall be subject to the requirements of the Employer or the commencement order issued by the supervision unit); design period: 90 calendar days to complete the construction drawing design and pass the drawing review.

Bidding scope: bidding scope of the first bid section (EPC general contracting, Including equipment): including all construction, procurement, installation, project acceptance and handover within the scope of scheme design, preliminary design, professional construction drawing design, budget document preparation, drawing change, as-built drawings, geological survey, etc. Within the scope of the project, responsible for coordinating the surrounding relations, cooperating with formalities, and controlling the project safety, quality, progress and cost; General contracting of the whole process of all the above related work, such as information and contract management.

Bid winning information:

First place: China Railway 23rd Bureau Group First Engineering Co., Ltd. No.

2: China Railway 14th Bureau Group Co., Ltd.

No.3: Tianyuan Construction Group Co., Ltd.

Project Name: Survey and Design of Comprehensive Land Renovation and Construction Project (Phase I) in Huacheng Town, Wuhua County, Meizhou City General contracting

construction site: Huacheng Town, Wuhua County, Meizhou City

Bidding scope: 3969.78 mu of agricultural land renovation, 77.86 mu of construction land consolidation, 9868.05 square meters of historical and cultural renovation and 785.45 mu of modern agricultural base construction are planned to be implemented in this project; The construction of intelligent agricultural production base is 193.41 mu; the construction of Huacheng Meat Processing Plant is 3185.20 square meters; the large-scale planting of Broussonetia papyrifera is 1250.

Bidding content: complete the survey work of this project: engineering survey, mapping, geophysical exploration, geotechnical engineering survey, etc. Total

planned construction period: 1,170 calendar days. Of which: 1) Survey period: 30 calendar days; 2) Design period: 60 calendar days; 3) Construction period: 1080 calendar days (the specific project period is subject to the actual contract signed).

Maximum bidding price limit: The maximum bidding price limit of this project is RMB 13693, including: survey fee of 1,274,500 yuan; design fee of 4,588,200 yuan; construction and installation fee of 13107.

Bid winning information:

First place: Wuhua County Huaxing Highway Engineering Co., Ltd.

Member 1: China Railway 19th Bureau Group Co., Ltd.

Member 2: Guangdong Jianke Architectural Design Institute Co., Ltd.

Member 3: Guangdong Dongtu Planning Technology Co., Ltd. Bid price of the Company

: 136555201.45 RMB

Second place: China Railway 25th Bureau Group Co., Ltd.

Member: China Communications Second Highway Survey and Design Institute Co., Ltd.

Bid price: 136045816.65 RMB

Third place: China Railway 18th Bureau Group Southern Engineering Co., Ltd.

Member 1: Guangdong Architectural Design & Research Institute Group Co., Ltd.

Member 2: Guosheng Design Co., Ltd.

Tender offer : 136785270.51 yuan

Project Name: Yunyan District Jinya Urban Village Reconstruction Supporting Infrastructure Project EPC

Construction Address: Yunyan District, Guiyang City

Construction Scale: The project construction involves Jinya Urban Village (number of reconstructed households: 564) Supporting infrastructure: (1) 2479 meters of gas pipe network, 2300 meters of drainage pipe network, 2800 meters of water supply pipe network, 1057 meters of internal supporting roads, 17 square meters of greening 18243, 133 lighting facilities, 2387 meters of power supply pipe network, 50 fire fighting facilities and 3 sets of monitoring equipment for relevant housing within the scope of urban villages.

Planned construction period: 24 months

. Total investment of the project: the 26505 is 0.93 million yuan, and the estimated contract amount of this bid section is about 0.26 million yuan 22400 (of which the design cost is about 3.3935 million yuan and the construction cost is about 22060).

All can be viewed after purchase
Correlation

(1) Rectify and renovate the disordered and staggered points of the 15 hm ² drainage system in Dianbai District, renovate the drainage pipe network of 300 km in the area, repair 30 km of defective drainage pipes, and repair and renovate 2 km of structurally damaged drainage culverts; (2) Build 15 km of new drainage pipes and set 200 drainage outlets; (3) Renovate 8 waterlogging-prone water accumulation points in Dianbai District and build 2 new drainage pumping stations. (4) Reconstruction of drainage pipe network in the area of Haibin Avenue (east side of Sengao Flood Drainage Channel).

2026-01-26 13:15:00

The strong growth of overseas product exports not only provides an effective help for domestic cement enterprises to relieve the current operating pressure, but also explores an important path for the industry to break through the bottleneck of development.