On January 23, Zhongneng Shengshi Maigaiti County 1 million kilowatt photovoltaic sand control power generation project (EPC bid section, supervision bid section) was tendered publicly. The tenderer was Zhongneng Shengshi (Maigaiti) Energy Development Co., Ltd. and the source of funds was self-financing of 3 billion yuan.

On January 23, Zhongneng Shengshi Maigaiti County's 1 million kilowatt photovoltaic sand control power generation project (EPC tender section, supervision tender section) was tendered by Zhongneng Shengshi (Maigaiti) Energy Development Co., Ltd. The source of funds is self-financing of 3 billion yuan .

The announcement shows that Zhongneng Shengshi Maigaiti County's 1 million kilowatt photovoltaic sand control power generation project is divided into six bidding sections , of which the first, second, third, fourth and fifth bidding sections are EPC bidding sections . The sixth bid section is the supervision section . In terms of

performance, This tender requires the bidder to undertake at least one similar project (centralized photovoltaic engineering construction project with a scale of 100MW or above ) since January 1, 2023 (subject to the date of contract signing). The planned duration of the

project is 365 calendar days . Bid section 1 to 5 of

this project accept consortium bidding , but the number of consortium members shall not exceed 3; bid section 6 does not accept consortium bidding . The time for obtaining the

bidding documents is from 9:00 on January 24, 2026 to 17:00 on January 30, 2026. The bid

closing/opening time is 9:00 on February 13, 2026.

All can be viewed after purchase
Correlation

On January 23, Zhongneng Shengshi Maigaiti County 1 million kilowatt photovoltaic sand control power generation project (EPC bid section, supervision bid section) was tendered publicly. The tenderer was Zhongneng Shengshi (Maigaiti) Energy Development Co., Ltd. and the source of funds was self-financing of 3 billion yuan.

2026-01-26 10:44:41

5000t/d cement clinker production line of Liaoning Yinsheng Cement Group Co., Ltd. The design capacity of the original cement clinker production line is 4000t/d, the supplementary capacity is 1000t/d, the replacement capacity is 2000t/d, and the replacement ratio is 2:1. A 2000t/d cement clinker production line of Cement Branch of Guizhou Bohong Industrial Co., Ltd. is used to replace the production capacity of this project. The production line has been shut down and is planned to be dismantled and withdrawn before November 30, 2026.