China Construction Eighth Engineering Group Co., Ltd. won the bid of 477 million yuan for the construction of Wuliangye Kangding Wenlu Hotel Project.

2026-05-20 13:20:14

Wuliangye Kangding Wenlu Hotel Project Construction General Contracting recently announced that the Eighth Bureau of China Construction won the bid with about 477 million yuan. Located at the foot of Paomashan Scenic Area in Kangding City, Ganzi Prefecture, Sichuan Province (the hometown of love songs), the project is positioned as an international five-star comprehensive resort hotel with a total construction area of about 34,000 square meters and 190 rooms planned. The project is located in the western Sichuan Plateau, with a planned construction period of 870 calendar days (about two and a half years), requiring high standards for hardcover, electromechanical, intelligent and architectural aesthetics.

Wuliangye Kangding Wenlu Hotel Project Construction General Contracting recently announced that the Eighth Bureau of China Construction won the bid with about 477 million yuan. Located at the foot of Paomashan Scenic Area in Kangding City, Ganzi Prefecture, Sichuan Province (the hometown of love songs), the project is positioned as an international five-star comprehensive resort hotel with a total construction area of about 34,000 square meters and 190 rooms planned. The project is located in the western Sichuan Plateau, with a planned construction period of 870 calendar days (about two and a half years), requiring high standards for hardcover, electromechanical, intelligent and architectural aesthetics.

[Project name] Wuliangye Kangding Wenlu Hotel Project Construction General Contracting

[First Bid Winning Party and Quotation] China Construction Eighth Engineering Bureau Co., Ltd.: 477,084,440.28 yuan (47. 7.0844 million yuan/about 477 million yuan)

[Basic information of the project] The project is located at the foot of Paomashan Scenic Area, Kangding City, Ganzi Prefecture, Sichuan Province, at the intersection of Princess Road and Paomashan South Road. The total building area is about 34000 square meters (about 26000 square meters above ground and about 8000 square meters underground), with about 190 rooms planned, and it is positioned as an international five-star comprehensive resort hotel. The planned construction period is 870 calendar days (about two and a half years), and the general contracting scope of construction covers all work contents within the scope of construction drawings and bidding lists, including construction, completion acceptance filing, handover and defect repair within the quality defect liability period. The project is invested and constructed by Wuliangye Group, which is an important layout of its "wine + tourism" integrated development model in the cultural and tourism territory of Western Sichuan.

All can be viewed after purchase
Correlation

Wuliangye Kangding Wenlu Hotel Project Construction General Contracting recently announced that the Eighth Bureau of China Construction won the bid with about 477 million yuan. Located at the foot of Paomashan Scenic Area in Kangding City, Ganzi Prefecture, Sichuan Province (the hometown of love songs), the project is positioned as an international five-star comprehensive resort hotel with a total construction area of about 34,000 square meters and 190 rooms planned. The project is located in the western Sichuan Plateau, with a planned construction period of 870 calendar days (about two and a half years), requiring high standards for hardcover, electromechanical, intelligent and architectural aesthetics.

2026-05-20 13:20:14

Dougezhuang Township, Laozi Chaoyang District, the new hospital area of Beijing Traditional Chinese Medicine Hospital, is an important layout for Beijing's high-quality medical resources of traditional Chinese medicine to the southeast urban area. Beijing Urban Construction Group won the bid for the second bid section at a price of approximately RMB1.101 billion, which was approximately RMB36.88 million lower than estimated contract price of RMB1.138 billion, representing a line sticking rate of approximately 96.8%. With a total construction area of nearly 130,000 ㎡ and a construction period of 859 days, it is a large-scale public medical construction project.