Tancheng County TC-2 wind power project EPC general contracting recently won the bid announcement, China Construction Fifth Engineering Bureau successfully won the bid with about 975 million yuan. The project is located in Tancheng County, Linyi City, Shandong Province, with a planned installed capacity of 181.25 MW. 29 6.25 MW large-capacity units are selected, with a hub height of 185 meters and a mixed tower structure. It is a technical benchmark project in the field of low wind speed wind power in the plain. The winning bidder undertakes the EPC task of the whole process from design, procurement, construction to grid connection.
[Project Name] Tancheng County TC-2 Wind Power Project EPC General Contracting
[First Bid Winner and Quotation] China Construction Fifth Engineering Bureau Co., Ltd.: RMB 975,066,553.00 (RMB 97,553.00) 5.0666 million yuan/about 975 million yuan)
[Basic information of the project] The project is located in the middle of Tancheng County, Linyi City, Shandong Province, involving four townships of Chongfang Town, Gangshang Town, Matou Town and Tancheng Street. The total installed capacity is 181.25 MW, 29 EW6.25 N-220 units are installed (single unit capacity is 6.25 MW, impeller diameter is about 220 meters), hub height is 185 meters, and the tower is of * * concrete-steel mixed tower (mixed tower) * * structure. The unit connection of "one machine and one transformer" is adopted, which is connected to the newly-built 220kV booster station through seven 35kV collector lines, and finally connected to Xinglin Substation through one 220kV line (the outgoing line is about 3 km long). EPC scope covers the whole process of wind turbine foundation, manufacturing and installation of mixed tower, unit hoisting, power collection line, booster station construction and outgoing line.
浙公网安备33010802003254号