Huadian Hebei 279 MW Offshore Photovoltaic Project Construction General Contracting Bidding!

2026-05-20 10:57:19

On May 19, Hebei Huadian Changli Offshore Photovoltaic Pilot Project issued a tender announcement for the general contracting project of the new A section of the offshore photovoltaic area, and the tenderer was Huadian Qinhuangdao New Energy Co., Ltd.

Digital New Energy DataBM. Com was informed that on May 19, the tender announcement for the general contracting project of the new A-section of the offshore photovoltaic pilot project in Changli , Hebei, was issued. The tenderer is Huadian Qinhuangdao New Energy Co., Ltd .

The announcement shows that the project is located in Changli County, Qinhuangdao City, Hebei Province, with a planned AC side capacity of about 460.8MM W . The scope of

华电河北279MW海上光伏项目施工总包招标!1

work covers the construction areas ① and ③ of the offshore photovoltaic area (the designed installed capacity of DC side of 1 # area and 3 # area is 342.98 MW, and the capacity of DC side of the completed construction part is 63.89 MWp. The scope of this tender is the photovoltaic power generation unit, confluence and substation equipment within the DC side installed capacity of 279.09 MW in the unconstructed part of the above area. Construction and installation works of control and protection equipment, cable trestle, etc.; laying works of power collection lines from the construction area of this bid section to the submarine cable conversion point. The performance period of the

bidding project is 16 months , and the tentative construction period is from July 1, 2026 to October 31 , 2027. Consortium bidding is not accepted

in this tender . The bidding documents will be

obtained from 17:26 on May 19 , 2026 to 18:00 on May 25, 2026. Bid

closing/opening time is 9:00 , June 9, 2026.

All can be viewed after purchase
Correlation

On May 19, Hebei Huadian Changli Offshore Photovoltaic Pilot Project issued a tender announcement for the general contracting project of the new A section of the offshore photovoltaic area, and the tenderer was Huadian Qinhuangdao New Energy Co., Ltd.

2026-05-20 10:57:19

On May 18, the Qinghai Development and Reform Commission issued a public announcement on the evaluation and assessment of energy-saving work of key energy-using units in 2025.