Recently, the Natural Resources and Planning Bureau of Bengbu City, Anhui Province, announced the income assessment report on the transfer of mining rights of limestone for building stones and shale for cement ingredients in Dafengshan High-tech Zone. The appraisal value of the project is about 185 million yuan, the appraisal reserves are about 67 million tons, the design production scale is 6 million tons per year, and the proposed transfer period is 11 years.

The evaluation report shows that the mining area of Dafengshan Limestone Mine for Building Stones and Shale Mine for Cement Ingredients in Bengbu High-tech Zone of Anhui Province covers an area of 0.6473 square kilometers. Within the mining area, there are 35.3721 million tons of limestone for building stones, 26.5265 million tons of shale for cement ingredients and 2.652 million cubic meters of stripping materials; It can mine 33.6456 million tons of limestone for building stones, 25.2317 million tons of shale for cement ingredients and 2.652 million cubic meters of stripping materials. The product scheme determined by
the assessment includes the specifications of gravel (0-10mm, 10-20mm and other models), raw shale ore and comprehensive utilization of stripping materials (backfilling and reclamation soil). Among them, the sales price of gravel excluding tax is 40.45 yuan/ton, that of raw shale is 21.67 yuan/ton, and that of comprehensive utilization stripping is 17.7 yuan/m3.
In addition, the project is a new mine, and there is no actual sales data. According to the survey, the sales price of local gravel in the High-tech Zone is about 37-42 yuan/ton without tax, the sales price of shale for cement ingredients is about 15-20 yuan/ton without tax, and the sales price of comprehensive utilization stripping (backfilling and reclamation soil) is about 20 yuan/m3 with tax, which is equivalent to 17.7 yuan/m3 without tax. After calculation, the appraisal value of the project is about 185 million yuan.
浙公网安备33010802003254号