Jiangsu 100MW Photovoltaic EPC Project General Contracting Bidding!

2026-02-02 13:20:53

On January 30, the EPC project of 100MW fishing-photovoltaic complementary photovoltaic power generation project in Wangji Town, Siyang County, Jingneng was tendered by the Central China Branch of Beijing Jingneng Clean Energy Power Co., Ltd.

On January 30, the EPC project of 100 MW fishing-photovoltaic complementary photovoltaic power generation project in Wangji Town, Siyang County, Jingneng was tendered by the Central China Branch of Beijing Jingneng Clean Energy Power Co., Ltd.

According to the announcement, the project is located in Siyang County, Suqian City, Jiangsu Province, with a total installed capacity of 130MW on the DC side and 100MW on the AC side (including photovoltaic area, 110kV booster station, collector line, etc.). The bidding scope of the project includes but is not limited to the design, procurement and construction of the project ( components are provided by the Employer). In terms of

performance, this tender requires the contractor to provide the EPC general contracting performance of at least one 100MW or more fishing-photovoltaic complementary photovoltaic project from 2023 to 2025 (based on the grid-connected time). The key pages of the contract, the grid connection or completion certificate or completion acceptance certificate issued by the Owner shall be provided). Consortium bidding is not accepted for

this project . The time for obtaining the

bidding documents is from 16:00 on January 30, 2026 to 16:00 on February 5, 2026. The bid

closing/opening time is 9:30 on February 27, 2026.

All can be viewed after purchase
Correlation

On January 30, the EPC project of 100MW fishing-photovoltaic complementary photovoltaic power generation project in Wangji Town, Siyang County, Jingneng was tendered by the Central China Branch of Beijing Jingneng Clean Energy Power Co., Ltd.

2026-02-02 13:20:53

In order to thoroughly implement the spirit of the National Work Programme for the Construction of "Waste-free Cities" in the "14th Five-Year Plan" period and the newly issued Action Plan for the Comprehensive Treatment of Solid Waste, and to implement the general requirement of synergistic effect of pollution reduction and carbon reduction, Huzhou Municipal Bureau of Ecology and Environment adheres to the problem-oriented and systematic management, and takes the lead in the whole province and even in the whole country. Recently, the Guidelines for the Construction of Waste-free Cement Industry (hereinafter referred to as the Guidelines) were officially issued. This marks that Huzhou has taken a key step in promoting the green and low-carbon transformation of high energy-consuming industries and deepening the construction of "waste-free city", which will provide replicable solid waste standardized management and comprehensive treatment for the national cement industry.