Cement net video: up to 856,000 yuan! Annual Salary Disclosure of 9 Senior Executives of China Building Materials

2026-01-16 09:40:44

On January 6, the announcement of the annual salary information disclosure of the head of China Building Materials Group was issued.

On January 6, the announcement of the annual salary information disclosure of the head of China Building Materials Group was issued. 

All can be viewed after purchase
Correlation

On January 6, the announcement of the annual salary information disclosure of the head of China Building Materials Group was issued.

2026-01-16 09:40:44

Lianyungang Pumped-storage Power Station is a first-class large (1) project. Its pivotal structures are mainly composed of upper reservoir, lower reservoir, water conveyance system, underground powerhouse system and ground switching station. The installed capacity of the power station is 1200 MW, which is a daily regulation power station. The power station is equipped with four single-stage vertical shaft mixed-flow reversible pump-turbine generator units with a single unit capacity of 300 MW and a rated head of 425m.