According to the statistics of the cement network, in December 2025, the kiln shutdown time was extended as a whole, and the capacity utilization rate decreased. The average number of kiln shutdown days in 23 regions in December was 15 days or more, and the longest was 30 days.
浙公网安备33010802003254号