China Railway First Engineering Group Co., Ltd. has a Xizang of 500 million yuan.

2026-05-06 09:51:37

Main construction contents of Phase I: annual output of 100 sets of 1500Nm3-2000Nm3 alkaline (ALK) electrolytic cell production line; 500MW/year plateau type PEM electrolytic cell production line; 40000t/a methanol synthesis device and component standardization production line; annual output of 120 sets of 500kW hydrogen-oxygen cogeneration integrated equipment assembly line; Annual output of 50 sets of 500 kg/day skid-mounted methanol hydrogenation station integrated equipment production line and corresponding auxiliary production facilities.

Zangqing Industrial Park Green Hydrogen Green Alcohol New Energy Industrialization Zero Carbon Intelligent Assembly Base (Phase I)

Project Location: north of Lhasa Road in Zangqing Industrial Park, east of Nianchuhe Road, west of Xizang Jade Jewelry. (Parcel No.: A-23-02)

Construction Scale: Main construction contents of Phase I: annual production of 100 sets of 1500Nm3-2000Nm3 alkaline (ALK) electrolytic cell production lines, 500MW/year plateau type PEM electrolytic cell production lines, 40000t/a methanol synthesis devices and component standardization production lines; Annual output of 120 sets of 500 kW hydrogen-oxygen cogeneration integrated equipment assembly line; annual output of 50 sets of 500 kg/day skid-type methanol hydrogenation station integrated equipment production line and corresponding auxiliary production facilities.

Bid winning information:

First place: China Railway First Engineering Group Co., Ltd.

Bid price (RMB): 522343134.00

Second place: Guizhou Construction Engineering Group No.3 Construction Engineering Co., Ltd.

Bid price (RMB): 5 22629240.30

No.3: Guangxi Construction Engineering Group No.4 Construction Engineering Co., Ltd.

Bid Price (RMB): 522552280.40

All can be viewed after purchase
Correlation

Main construction contents of Phase I: annual output of 100 sets of 1500Nm3-2000Nm3 alkaline (ALK) electrolytic cell production line; 500MW/year plateau type PEM electrolytic cell production line; 40000t/a methanol synthesis device and component standardization production line; annual output of 120 sets of 500kW hydrogen-oxygen cogeneration integrated equipment assembly line; Annual output of 50 sets of 500 kg/day skid-mounted methanol hydrogenation station integrated equipment production line and corresponding auxiliary production facilities.

2026-05-06 09:51:37

On November 26, 2026, Zhou Yuxian, President of China Cement Association, and his delegation went to Hubei to investigate the cement industry symposium held in Wuhan. Zhou Yuxian, president of China Cement Association, attended and delivered a speech. Wang Xuejun of Hubei Cement Industry Association presided over the meeting. Representatives of key enterprises such as Huaxin, Gezhouba, Queshi, Yadong, Jinglan and Jianfeng attended the meeting. Chen Berlin, Vice Secretary-General of China Cement Association, Hao Guozhu, Director of Party Construction Ministry of Culture, and Xiong Yue, Secretariat, participated in the survey, which was hosted by Queshi Group.