Shandong: Announcement on Replacement Plan for Supplementary Capacity of Xintai Zhonglian Taifeng Cement and Pingyi Zhonglian Cement Clinker Production Lines

2026-01-07 16:51:36

Two cement enterprises in Shandong have achieved compliance expansion through capacity replacement, using a total of 2400t/d and 1600t/d capacity indicators of Dezhou Zhonglian Dam, all from key areas of air pollution prevention and control, eliminating old production lines, not reusing capacity, and promoting green upgrading of the industry.

In accordance with the relevant provisions of the Measures for the Implementation of Capacity Replacement in the Cement and Glass Industry (2024 edition) (No.206 of the Ministry of Industry and Information Technology) and the relevant policy requirements for capacity management in the cement industry, and in accordance with the verification opinions of the Bureau of Industry and Information Technology of Tai'an City and Linyi City, the Ministry of Industry and Information Technology of the Ministry of Industry and Information Xintai Zhonglian Taifeng Cement Co., Ltd., If there is any objection to the cement Zhonglian Cement Co., Ltd. Please report to the Provincial Department of Industry and Information Technology in writing. Please affix the official seal for the unit's report. Please provide the real name and contact information for the individual's report.

Publicity period: January 7 to January 21, 2026.

All can be viewed after purchase
Correlation

Two cement enterprises in Shandong have achieved compliance expansion through capacity replacement, using a total of 2400t/d and 1600t/d capacity indicators of Dezhou Zhonglian Dam, all from key areas of air pollution prevention and control, eliminating old production lines, not reusing capacity, and promoting green upgrading of the industry.

2026-01-07 16:51:36

5000t/d cement clinker production line of Liaoning Yinsheng Cement Group Co., Ltd. The design capacity of the original cement clinker production line is 4000t/d, the supplementary capacity is 1000t/d, the replacement capacity is 2000t/d, and the replacement ratio is 2:1. A 2000t/d cement clinker production line of Cement Branch of Guizhou Bohong Industrial Co., Ltd. is used to replace the production capacity of this project. The production line has been shut down and is planned to be dismantled and withdrawn before November 30, 2026.