2025, the Department of Economy and Information Technology of Zhejiang Province issued a public announcement on the replacement plan of supplementary production capacity of No.1 and No.2 cement clinker production lines of Zhejiang Hongshi Cement Co., Ltd.

The announcement shows that the two 2000t/d clinker production lines of Zhejiang Hongshi Cement Co., Ltd. have supplementary capacity of 600t/d and 400t/d respectively, and the replacement ratio is 2:1. A 2000 t/d cement clinker production line of Zhejiang Qinglongshan Building Materials Co., Ltd. is used for the replacement capacity of 1200t/d and 800t/d respectively for the above project. The main equipment of this production line is planned to be dismantled before the announcement.

浙公网安备33010802003254号