On December 31, the Liaoning Provincial Office of Industry and Information Technology issued a public announcement on the organization of a hearing on the replacement plan for the supplementary capacity of the 2 # cement clinker production line with a daily output of 5000 tons of Liaoning Yinsheng Cement Group Co., Ltd.
In order to implement the spirit of documents such as the Guiding Opinions of the State Council on Resolving the Serious Contradiction of Overcapacity (Guofa [2013] 41) and the Measures for the Implementation of Capacity Replacement in Cement and Glass Industry (2024 edition) (Ministry of Industry and Information Technology [2024] 206), we will resolutely and strictly examine and verify the project capacity replacement plan in accordance with the law and regulations. In order to prevent fraud and eliminate hidden dangers of supplementary production capacity, according to the requirements of relevant documents, Liaoning Provincial Office of Industry and Information Technology entrusted China Building Materials Industry Planning Research Institute to organize a hearing on the replacement scheme of supplementary production capacity of Liaoning Yinsheng Cement Group Co., Ltd. Review the replacement plan for the supplementary production capacity of the 2 # cement clinker production line with a daily output of 5,000 tons of Liaoning Yinsheng Cement Group Co., Ltd., and listen to the opinions and suggestions from all sides on the compliance, authenticity, effectiveness and compliance with the industrial policy requirements of the production capacity indicators used for the replacement of the supplementary production capacity.

The replacement plan shows that the Cement Branch of Guizhou Bohong Industrial Co., Ltd. transfers 2000t/d production capacity to Liaoning Yinsheng Cement Group Co., Ltd. to supplement the 4000t/d production capacity of Line 2 # to 5000t/d, with a replacement ratio of 2:1.

The following is the announcement of relevant matters:
I. Hearing Matters
Review of the Replacement Plan for Supplementary Capacity of 2 # Cement Clinker Production Line with a Daily Output of 5000 Tons of Liaoning Yinsheng Cement Group Co., Ltd. To listen to opinions and suggestions from all sides on the compliance, authenticity, effectiveness and conformity with the requirements of industrial policies of the capacity indicators used for supplementary capacity replacement. Time and Place
of the
Hearing Time: January 8
, 2026 Place: Liaoyang City
, Liaoning Province III. Organizer
of the Hearing China Building Materials Industry Planning and Research Institute
IV. Participants of the hearing and the method
of production (I) Presiding officer of the hearing (1 person): designated by China Building Materials Industry Planning and Research Institute.
(II) Hearing recorder (1 person): designated by China Building Materials Industry Planning and Research Institute.
(III) Hearing presenter (1 person): designated by Liaoning Yinsheng Cement Group Co., Ltd.
(IV) Hearing supervisor (1 person): to be determined.
(5) Administrative personnel of administrative organs: to be determined.
(VI) Hearing representatives
1. Interested party representatives: The number of interested party representatives shall not exceed 5, and shall be selected through open and voluntary registration. When the number of applicants exceeds the planned number, they shall be selected randomly.
2. Representatives of the general public: the number of places shall not exceed 4, and they shall be selected through open and voluntary registration. When the number of applicants exceeds the planned number, they shall be selected randomly.
3. Industry experts: 5, invited.
4. Legal worker: 1 person, invited.
5. Representatives that the hearing organ considers should participate: to be determined.
(VII) Observers: The number of bystanders shall not exceed 5, which shall be selected through voluntary application. When the number of applicants exceeds the planned number, the bystanders shall be selected randomly.
5. Registration time, deadline and method
(1) Registration time: December 31, 2025 to January 5, 2026.
(2) Registration method: Download the registration form in Annex 2 of this announcement, fill it in and send it to China Building Materials Industry Planning and Research Institute by mail. Applicants are requested to truthfully fill in the personal information specified in the application form (with a copy of identity card), as well as the basic opinions and reasons for the hearing matters (the bystander does not need to fill in this item). If they register for the hearing on behalf of a legal person or other organization, they should also fill in the name and office space of the legal person or other organization they represent.
VI. Notice
of the Hearing The participants in the hearing shall familiarize themselves with the hearing matters and hearing materials before the hearing, and in line with the principle of seeking truth from facts, review the replacement plan for the supplementary production capacity of the 2 # cement clinker production line with a daily output of 4000 tons of Liaoning Yinsheng Cement Group Co., Ltd. Put forward opinions and suggestions on the compliance, authenticity, effectiveness and conformity with industrial policy requirements of the capacity indicators used for supplementary capacity replacement. The participants in the
hearing shall abide by the rules of the hearing and obey the arrangement of the presiding hearer.
Participants in the hearing shall abide by the discipline of the venue and shall not act in a manner that affects the normal convening of the hearing.
Registration contact: Angel (China Building Materials Industry Planning and Research Institute)
Tel: 18611989268
Email: 1070861365@qq.com
is hereby announced. December 31
,2025
浙公网安备33010802003254号