Recently, Shijiazhuang, Tangshan, Qinhuangdao, Baoding, Zhangjiakou, Hengshui, Chengde, Langfang and other eight places in Hebei Province have issued opinions on the investigation and disposal of independent energy storage projects.
Up to now, there are 105 projects involved, with a total scale of 15.7 GW/51.5 GWh, including 11 cancelled projects, with a total scale of 1.15 GW/3.64 GWh; 50 delayed/grid-connected projects, with a total scale of 7.7 GW/25.16 GWh; There are 40 normal projects with a total scale of 6.45 GW/21.695 GWh, and 4 full-capacity grid-connected projects with a total scale of 0.4 GW/1 GWh.
浙公网安备33010802003254号