CITIC Bo Wins 1.5g W Photovoltaic Big Order!

2026-04-13 09:36:54

Recently, CITIC Bo and Shandong Electric Power Construction Third Engineering Co., Ltd. (Hereinafter referred to as "SEPCOIII") signed the supply agreement of tracking bracket system for PV4 Hazza 1.5G W (AC side) photovoltaic project in Abu Dhabi, United Arab Emirates.

Recently, Signing of PV4 Hazza in Abu Dhabi, United Arab Emirates between CITIC Bo and SEPCOIII (hereinafter referred to as SEPCOIII) 1.5G W (AC side) PV Project Tracking Bracket System Supply Agreement. During the signing of the

contract

, the leaders of the two sides held in-depth talks on the core issues of project landing, resource coordination and the long-term layout of the global new energy market. It is clear that in the future, the two sides will support each other and work together to carry out global and all-round cooperation in key areas such as project development and technological innovation. The scene

of the

talks between the two sides

All can be viewed after purchase
Correlation

Recently, CITIC Bo and Shandong Electric Power Construction Third Engineering Co., Ltd. (Hereinafter referred to as "SEPCOIII") signed the supply agreement of tracking bracket system for PV4 Hazza 1.5G W (AC side) photovoltaic project in Abu Dhabi, United Arab Emirates.

2026-04-13 09:36:54

It is understood that the company recruited restructuring investors by bidding in 2025, with a starting price of 5.3 million yuan.