Shandong virtual power plant construction and operation management measures officially issued!

2026-07-07 16:25:25

Shandong has introduced the first provincial-level virtual power plant management measures to clarify the rules of construction, operation, trading and supervision, and to promote the construction of new power systems and the green and low-carbon transformation of energy.

On July 7, the Management Measures for the Construction and Operation of Virtual Power Plants in Shandong Province was officially issued, which was first issued in the form of provincial management measures. It is specified that the virtual power plant can meet the requirements of " documents, and the distributed power generation aggregation unit of the virtual power plant shall meet the requirements of data access quality. It uploads the operation information to the power dispatching organization in real time, and has the ability to receive and execute the regulation and control instructions issued by the power dispatching organization, so as to realize the direct acquisition and regulation of distributed photovoltaic output.

In the capability test requirements, document" clearly States that the virtual power plant participating in the market should be able to accurately upload the operation data of the virtual power plant, receive the clearing results of the spot market, and realize the optimization and decomposition of the clearing results. And sen an active power regulation real-time instruction or a plan curve and that like to all aggregate resource terminals.

Participate in the day-ahead market: it shall have the function of information interaction with the dispatching system or load system, and the information interaction time shall be at the minute level. It can receive and execute the day-ahead plan curve and respond to the dispatching instructions.

Participate in the real-time market: it shall have the function of real-time information interaction with the dispatching system, and the information interaction time shall not be more than 60 seconds. It can track the real-time market plan curve and respond to the dispatching instructions in real time.

All can be viewed after purchase
Correlation

Shandong has introduced the first provincial-level virtual power plant management measures to clarify the rules of construction, operation, trading and supervision, and to promote the construction of new power systems and the green and low-carbon transformation of energy.

2026-07-07 16:25:25