On July 7, the Management Measures for the Construction and Operation of Virtual Power Plants in Shandong Province was officially issued, which was first issued in the form of provincial management measures. It is specified that the virtual power plant can meet the requirements of " documents, and the distributed power generation aggregation unit of the virtual power plant shall meet the requirements of data access quality. It uploads the operation information to the power dispatching organization in real time, and has the ability to receive and execute the regulation and control instructions issued by the power dispatching organization, so as to realize the direct acquisition and regulation of distributed photovoltaic output.
Participate in the day-ahead market: it shall have the function of information interaction with the dispatching system or load system, and the information interaction time shall be at the minute level. It can receive and execute the day-ahead plan curve and respond to the dispatching instructions.
Participate in the real-time market: it shall have the function of real-time information interaction with the dispatching system, and the information interaction time shall not be more than 60 seconds. It can track the real-time market plan curve and respond to the dispatching instructions in real time.
浙公网安备33010802003254号