Yunnan Province plans to revise the detailed rules of cement production capacity replacement, involving the requirements of clinker production line.

2026-11-26 13:50:18

On November 25, the Department of Raw Materials Industry of the Department of Industry and Information Technology of Yunnan Province issued a public announcement on the Rules for the Implementation of Capacity Replacement in the Cement and Glass Industry of Yunnan Province (Draft for Opinions). The main revised content is the requirement for supplementary production of cement clinker.

On November 25, the Department of Raw Materials Industry of the Department of Industry and Information Technology of Yunnan Province issued a public announcement on the Rules for the Implementation of Capacity Replacement in the Cement and Glass Industry of Yunnan Province (Draft for Opinions). The main modification content is cement

Yunnan Cement Glass Industry Capacity Replacement Implementation Rules

Chapter I Article 1 of the General Provisions

is to further consolidate the achievements of the cement and glass industry in capacity removal, standardize the management of capacity replacement, and promote the layout optimization, structural adjustment and transformation and upgrading of the cement and glass industry in the whole province. These Rules are formulated in accordance with the Notice of the Ministry of Industry and Information Technology on Issuing the Implementation Measures for Capacity Replacement in the Cement and Glass Industry (2024 Version) (Ministry of Industry and Information Technology [2024] No.206, hereinafter referred to as the Implementation Measures for Replacement (2024 Version)) and in combination with the actual situation of our province. Article

2 These Rules shall apply to the new (reformed) cement clinker and flat glass projects of all kinds of ownership enterprises within the administrative region of Yunnan Province, as well as the cement clinker production capacity projects.

Third, it is strictly forbidden to put on record cement clinker and flat glass projects with new production capacity. If it is really necessary to build or supplement the production capacity, in addition to the circumstances involved in Article 4 of these Rules, the construction project shall formulate and announce the capacity replacement plan before filing, and implement the equivalent or reduced capacity replacement. Article

4 The capacity replacement plan may not be formulated under the following circumstances:

(1) Relying on the existing cement kilns and glass melting kilns to implement technical transformation projects that do not expand production capacity, such as pollution reduction and carbon reduction, energy saving and consumption reduction, resource conservation and efficient utilization, and co-disposal.

(2) Industrial flat glass projects with new furnace capacity not exceeding 150 tons per day. Article

5 New production lines shall reach the benchmark level of energy efficiency in the cement and glass industry in the current edition of Benchmarking Level and Benchmarking Level of Energy Efficiency in Key Industrial Areas, and the level of environmental performance shall reach Grade A. New production capacity of cement clinker and flat glass is strictly prohibited in key areas of national air pollution prevention and control. Article

6 The key areas for the prevention and control of air pollution referred to in these Rules shall be defined in accordance with the Action Plan for the Continuous Improvement of Air Quality and the relevant documents of the State Council. Chapter

II Replacement Requirements

Article 7 The production capacity used for replacement must be compliant and effective, and cannot be used for replacement under any of the following circumstances:

(1) According to the requirements of the current version of the Catalogue for the Guidance of Industrial Structure Adjustment, the production capacity belongs to the national elimination category; The production capacity that has enjoyed the reward and subsidy of withdrawal funds (except for the compensation and reward due to employee resettlement and land recovery); the production capacity that has incomplete approval procedures such as filing and environmental assessment, has not obtained the pollutant discharge permit according to law or has expired the permit; the production capacity of cement clinker that has no production permit for cement products or has expired the permit.

(2) The production capacity of cement clinker and flat glass that is not within the scope of the compliance list submitted annually by the competent departments of industry and information technology at the provincial level to the Ministry of Industry and Information Technology.

(3) The production capacity of cement clinker and flat glass whose energy efficiency fails to meet the requirements of the benchmark level of the current edition of the Benchmark Level and Benchmark Level of Energy Efficiency in Key Industrial Areas.

(4) Cement clinker and flat glass production capacity that has been shut down for two consecutive years or more since 2013 (except for peak staggering production schemes formulated or agreed by provincial authorities and local planning adjustments), cement clinker production capacity that has been operating for less than 90 days per year for two consecutive years since 2024, and cement clinker production capacity that has been shut down for more than two consecutive years since 2013. Flat glass production lines that are required by the local government to stop production for more than two years due to force majeure;

(5) The production capacity of photovoltaic rolled glass that has not been replaced, or the production capacity of industrial flat glass that does not exceed 150 tons per day.

(6) The production capacity of cement clinker and flat glass that cannot be dismantled due to debt disputes or other reasons or that are sealed up by the court.

(7) Production capacity of cement clinker production line of newly-built phosphorus (titanium, fluorine) gypsum without capacity replacement.

(VIII) Cement clinker production capacity with splitting. Article

8 The quantity of production capacity used for replacement shall be determined strictly according to the production capacity specified in the project filing (approval) documents, and the number of days of annual production capacity shall be calculated according to 300 days. Article

9 Replacement ratio of cement clinker production capacity. The replacement ratio of production capacity replacement construction projects in Yunnan Province shall not be less than 1. The production capacity of restricted equipment in the national industrial structure adjustment catalogue and the inter-provincial replacement capacity shall be used as the replacement capacity, and the replacement ratio of production capacity shall not be less than 2:1. The following circumstances are excluded:

(I) The replacement ratio of production capacity in the same factory area of the same legal person is 1:1.

(II) The replacement ratio of phosphorus (titanium, fluorine) gypsum treated by the new cement kiln production line is 1:1.

(Three) meet the conditions of Article 11. Article

10 Replacement ratio of flat glass production capacity. The replacement ratio of capacity replacement construction projects in Yunnan Province shall not be less than 1:1. The following circumstances are excluded:

(I) The replacement ratio of production capacity in the same factory area of the same legal person is 1:1. Photovoltaic rolled glass projects are

encouraged to be constructed through capacity replacement. The replacement ratio is 1:1, and the capacity can be used for replacement again.

(Three) meet the conditions of Article 11. Article

11 The relocation of projects that do not belong to the state's explicit order to eliminate production capacity and do not enjoy the reward and reward for withdrawing production capacity funds (except for the compensation and reward for the resettlement of workers and land recovery) is due to the adjustment of the state's or provincial land, transportation, environmental protection and other plans or the overall planning of the state (city), and the relocation place is in the same state (city). Capacity replacement can be carried out according to 1:1. Article

12 In prefectures (cities) where the average capacity utilization rate of cement clinker is less than 50% in the first three years, the cement clinker production lines within their jurisdiction shall carry out capacity replacement, and in principle, they shall not replace capacity from outside the province. Article

13 The construction projects of white Portland cement, sulphoaluminate and ferroaluminate cement clinker shall be replaced by the same amount, and the clinker production capacity can only be replaced by the same kind of products when it is replaced again. The capacity replacement ratio of other special cement is the same as that of general cement. Chapter

III Contents and Confirmation

of Replacement Schemes Article 14 Project construction enterprises or enterprises with supplementary production capacity shall formulate capacity replacement schemes in accordance with the relevant provisions of these Rules (Annex 1). The capacity replacement plan shall specify but not be limited to the following contents:

(1) The name of the enterprise to which the construction project or the supplementary capacity project belongs, the design capacity, the construction site, the specification, model and quantity of the main equipment, the total energy consumption and emission, and the planned time of ignition and production.

(2) Enterprise name, unified social credit code, specifications, models and quantities of main equipment, address, filing or approval documents and design capacity, planned shutdown time and planned demolition and withdrawal time, production license, etc. Article

15 Where the transfer of production capacity across provinces or prefectures (cities) is involved, it shall be handled in accordance with the following provisions:

If the production capacity within the same corporate enterprise group is transferred across prefectures (cities) or provinces, the enterprise that transfers the production capacity may not formulate a plan for the transfer of production capacity and submit it to the competent department of industry and information technology of the prefecture (city) where the production capacity is transferred for verification; The capacity transfer-in enterprise shall sign a contract with the capacity transfer-out enterprise, requiring the capacity transfer-out enterprise to issue a letter of commitment (Annex 3) to ensure that the main equipment corresponding to the transfer-out capacity is dismantled on schedule and the aftertreatment work is carried out. Where capacity replacement is implemented within

a non-legal person enterprise group, the capacity transfer-out enterprise shall formulate a capacity transfer-out plan (Annex 2) and submit it it to the competent industrial and information departments of the prefectures (cities) where the capacity is transferred for verification. After acceptance by the competent industrial and information departments of the transferred prefectures (cities), the authenticity and compliance of the transferred capacity shall be verified in a timely manner. After verification, those who meet the requirements shall be publicized to the public on the portal website. If the production capacity is transferred out across States (cities), the publicity time shall not be less than 10 working days, and the announcement shall be made after the publicity without objection. If the production capacity is transferred out across provinces, the publicity time shall not be less than 5 working days, and the report shall be submitted to the Provincial Department of Industry and Information Technology for review after the publicity without objection.Article

16 Where the same legal person enterprise group transfers capacity across provinces or States (cities) into new (reformed) construction projects or completes the project capacity, the authenticity and compliance of the capacity transferred out for replacement, the shutdown of the corresponding main equipment (production line), and the completion of the post-processing of the enterprise, etc., shall be determined by the relevant departments. When verifying the capacity replacement plan, the competent departments of industry and information technology of the prefectures (cities) and the provincial departments of industry and information technology of the construction projects shall verify it synchronously in accordance with the division of labor in Articles 17 and 18 of these Rules. Article

17 The capacity replacement plan formulated by an enterprise shall be submitted to the competent department of industry and information technology of the prefecture (city) where the project is constructed for verification in accordance with the principle of territoriality. The competent department of industry and information technology of the state (city) where the project is located shall organize timely verification after acceptance. If the verification meets the requirements, the capacity replacement plan shall be publicized on the portal website for not less than five working days, and shall be submitted to the Provincial Department of Industry and Information Technology for review after publicity without objection. In case of capacity replacement within the same corporate enterprise group, the capacity replacement plan can be publicized on the portal website only after verifying and confirming that the main equipment (production line) corresponding to the transferred capacity has stopped production and the enterprise has completed the post-treatment work (simultaneous publicity of the letter of commitment, Annex 3). After publicity without objection, it shall be submitted to the Provincial Department of Industry and Information Technology for review. Article

18 After accepting the application for examination and verification of the capacity replacement scheme, the Provincial Department of Industry and Information Technology shall organize and carry out the examination and verification work in a timely manner. After verification, those who meet the requirements shall be publicized to the public on the portal website of the Provincial Department of Industry and Information Technology for not less than 10 working days, and shall be announced after publicity without objection. If a new project is implemented in our province by transferring production capacity across provinces, the Provincial Department of Industry and Information Technology shall entrust industry organizations or intermediaries to hold hearings before publicizing the capacity replacement plan. The participants in the hearing are generally composed of representatives of the government, associations, enterprises, the public and the media, and fully demonstrate whether the capacity replacement scheme meets the relevant national policies and regional development requirements. If a new project is implemented in our province by transferring production capacity across provinces within the same legal person enterprise group, after the announcement of the capacity replacement plan, the Provincial Department of Industry and Information Technology shall timely inform the provincia l competent department of industry and information technology of the place where the production capacity is transferred. Article

19 Materials required for examination and verification of production capacity transfer-out plan.

(1) Application documents;

(2) Production capacity transfer-out plan;

(3) Copy of the business license of the enterprise;

(4) The approval documents of the production line corresponding to the transferred production capacity, such as the filing, environmental assessment, energy assessment, land, etc., the pollutant discharge permit, the production permit, and the certification materials of the compliance and effective production capacity in accordance with Article 7 of these Rules;

(5) The letter of commitment of the enterprise with the transferred production capacity (Annex 3);

(6) Certification materials for the transfer of production capacity that has stopped production and completed the post-treatment work (provided by the implementation of capacity replacement within the same legal person enterprise group);

(7) Publicity materials of the capacity transfer scheme on the portal website of the competent industrial and information departments of prefectures (cities) (cross-provincial replacement of non-identical corporate enterprise groups shall be provided when submitted to the provincial level for review). Article

20 Materials required for examination and verification of capacity replacement plan.

(1) Application documents;

(2) Capacity replacement plan;

(3) Copy of the business license of the enterprise;

(4) Certification materials for the transfer of production capacity that has stopped production and completed the post-treatment work (provided by the implementation of capacity replacement within the same legal person enterprise group);

(5) Publicity materials of the capacity transfer scheme on the portal website of the state (city) competent department of industry and information technology (cross-provincial replacement of non-identical legal person enterprise groups, provided when submitted to the provincial level for review) and announcement materials (cross-state (city) replacement of non-identical legal person enterprise groups, provided when submitted to the provincial level for review);

(6) Publicity materials of the capacity replacement scheme on the portal website of the state (city) competent department of industry and information technology (provided when submitted to the provincial level for review and acceptance). Chapter

IV Limitation

of Scheme Article 21 Within two years from the date of announcement, the project construction enterprise shall complete the formalities of filing and environmental assessment, complete the project construction and put it into operation within three years, and the overdue capacity replacement scheme shall be invalid. Article

22 If the announcement of the capacity replacement plan has been completed and the construction of the project has not been started before November 1, 2024, the project shall be ignited and put into operation before the end of December 2026; if the project has not been completed, the capacity replacement plan shall be invalid after January 1, 2027. Chapter

V Supervision and Implementation

of the Scheme Article 23 Enterprises that use the original equipment as industrial heritage (industrial tourism) shall report to the Provincial Department of Industry and Information Technology for approval on a case-by-case basis without ensuring the production of cement or flat glass. Article

24 If the capacity replacement scheme has not been implemented or its content has changed significantly, it shall be submitted to the Provincial Department of Industry and Information Technology for review after verification and confirmation by the competent department of industry and information technology of the state (city) where the project construction enterprise is located, and the Provincial Department of Industry and Information Technology shall follow the procedures. And announce it to the public. If the scheme is changed, cancelled or invalidated, the production capacity that meets the requirements may continue to be transferred out. Article

25 Except for the situation stipulated in Article 15 that it is not necessary to report to the competent industrial and information departments of the transferred prefectures (cities) for verification, the competent industrial and information departments of the transferred prefectures (cities) shall urge the transferred enterprises to shut down and dismantle the main equipment (production lines) for replacement in accordance with the promised time limit. According to the demolition progress of the main equipment (production line) of the transfer-out capacity, the transfer-out capacity enterprise may submit an application for acceptance of the demolition of the main equipment (production line) of the transfer-out capacity to the competent department of industry and information technology of the territorial state (city). After acceptance, the competent industrial and information departments of prefectures (cities) shall organize timely verification and acceptance, and fill in the Verification and Acceptance Form for Dismantling of Equipment Transferred out of Production Capacity (Annex 4). If the production capacity is transferred out across the state (city), the competent department of industry and information technology of the state (city) where the production capacity is transferred out shall verify and confirm that the equipment is shut down and dismantled, the production license and the emission license are cancelled or changed in accordance with the law and regulations, and then the withdrawal of the transferred production capacity can be announced to the public on the portal website (Annex 5); Trans-provincial transfer of production capacity shall be reported to the Provincial Department of Industry and Information Technology for review and acceptance, and the Provincial Department of Industry and Information Technology shall organize experts to conduct on-site verification and acceptance. After the acceptance is passed, the Verification and Acceptance Form for Dismantling of Equipment with Transferred Production Capacity shall be issued. After the cancellation or alteration procedures of production license and pollutant discharge license are completed in accordance with the law and regulations, the withdrawal of the transferred production capacity shall be announced to the public (Annex 5). Article

26 Where the same legal person enterprise group transfers production capacity across provinces or States (cities) into new (reformed) construction projects or completes the production capacity of the project, the completion of the shutdown and dismantling of the main equipment (production line), the cancellation or alteration of the production license and the discharge license for the replacement of the transferred production capacity shall be subject to the approval of the relevant departments. When verifying the implementation of the capacity replacement scheme in accordance with Articles 28 and 29 of these Rules, the competent departments of industry and information technology of the prefectures (cities) of the construction project and the provincial departments of industry and information technology shall verify it separately according to the division of labor. Article

27 a construction project enterprise may submit an application for acceptance of the implementation of the capacity replacement scheme to the competent department of industry and information technology of the state (city) where the project is located according to the progress of the project construction and the withdrawal of the capacity transferred for replacement. If the following conditions are met, the competent department of industry and information technology in the place where the project is located shall accept the application:

(1) New (reconstruction) projects. The main equipment (production line) corresponding to the transfer capacity for replacement shall be shut down and dismantled, the production license and emission license shall be cancelled or changed in accordance with the law and regulations, and the construction project has been completed and has the conditions for ignition and production.

(2) Completing production capacity projects. The main equipment (production line) corresponding to the transfer-out capacity used for replacement shall be shut down and dismantled, the production license and emission permit shall be cancelled or changed, and the new filing of the completed capacity project shall be completed. Article

28 After accepting the application for acceptance of the implementation of the capacity replacement scheme, the competent industrial and information departments of the prefectures (cities) where the construction projects and complementary capacity projects are located shall organize the acceptance in a timely manner, fill in the Acceptance Opinion Form for the Implementation of the Capacity Replacement Scheme (Annex 6), and submit it to the competent industrial and information departments of the prefectures (cities) where the projects are located. Publicize the implementation of the capacity replacement plan to the public on the portal website (Annex 7) for no less than 5 working days, and report to the Provincial Department of Industry and Information Technology for review and acceptance after publicity without objection. Article

29 After accepting the application for review and acceptance of the implementation of the capacity replacement scheme, the Provincial Department of Industry and Information Technology shall promptly organize experts to carry out on-site acceptance. If the acceptance is passed, it shall be announced in accordance with the procedures; if the acceptance is not passed, the competent department of industry and information technology of the prefecture (city) shall be instructed to supervise the rectification, and re-apply for acceptance after the rectification is in place. Article

30 Materials required for the acceptance of the implementation of the capacity replacement plan.

(1) Completed projects. Announcement documents of capacity replacement scheme, business license of enterprise, filing, start-up permit and other documents, purchase contract, order form and invoice of main equipment (provided by cement clinker project), feasibility study report, design and construction drawing of melting furnace, etc. (Provided by flat glass project), written commitment of enterprises not to alter (expand) the main equipment without authorization, and the construction of the main equipment. The acceptance opinion form for the implementation of the capacity replacement scheme issued by the competent department of industry and information technology of the prefecture (city) and the publicity materials of the portal website (provided when submitted to the provincial review and acceptance).

(2) Transfer out of production capacity.The image data before, during and after the removal of the main equipment corresponding to the transferred production capacity, the description of the equipment's whereabouts, and the commitment that the enterprise will never resume production; for the internal capacity replacement of the same corporate enterprise group, the certification materials for the implementation of the aftercare disposal work of the transferred production capacity enterprise and the verification opinions of the competent industrial and information departments of the prefecture (city) where the production capacity is transferred shall be provided; In case of capacity replacement across provinces and States (cities) within a non-identical legal person enterprise group, it is necessary to provide a verification opinion form for the removal of the main equipment (production line) corresponding to the transferred capacity and publicity materials for the removal of the equipment. Chapter

VI Supervision and Administration

Article 31 Enterprises shall implement their main responsibilities, strictly implement the announced capacity replacement plan, consciously accept the supervision of the competent departments of industry and information technology, and construction projects that fail to pass the verification of the implementation of the capacity replacement plan shall not be ignited for production. Article

32 New (reformed) construction projects and complementary capacity projects shall not be put into operation until the main equipment (production line) corresponding to the capacity transferred for replacement has been shut down and dismantled in place, the production license and the discharge license have been cancelled or changed according to law, and the complementary capacity projects have been re-filed. Only when the production capacity is completed, can production be organized according to the new record production capacity. Article

33 The competent department of industry and information technology of the prefecture (city) shall implement the responsibility of territorial supervision, supervise the implementation of the capacity replacement scheme announced by the enterprise, strengthen the continuous supervision after the verification of the implementation of the capacity replacement scheme, and prevent the enterprise from changing (expanding) the main equipment without authorization and increasing the capacity in violation of regulations after the completion of the project acceptance. Those who find violations of laws and regulations such as new production capacity shall be dealt with in accordance with the law. Article

34 The competent departments of industry and information technology in all prefectures (cities) shall further smooth the channels for reporting, make public various forms of reporting such as telephone, fax, e-mail and network on the portal website in a timely manner, and accept social supervision. Associations, enterprises, the public and the media are encouraged to supervise the implementation of capacity replacement schemes and construction projects. Article

35 The Provincial Department of Industry and Information Technology, in conjunction with relevant departments, shall supervise the implementation of the capacity replacement plan according to the division of responsibilities. If fraud is found, the relevant departments shall be requested to deal with it in accordance with relevant policies and regulations such as investment and environmental protection, and the project shall not be ignited and put into operation before the rectification is in place. Conduct regular spot checks in conjunction with relevant departments, and cancel the capacity replacement plan in time for construction projects or complementary capacity projects that fail to comply with the requirements of these Rules. Article

36 All prefectures (cities) shall strictly implement the requirements for the construction of a unified national market, break down local protection and regional barriers, conform to the law of industrial development, support the orderly flow of effective production capacity to advantageous areas under the guidance of the market, and shall not set unreasonable thresholds, promulgate restrictive policies or block the normal transfer of production capacity in disguised form. Article

37 These Detailed Rules shall come into force as of January, 2026, and shall be revised in due course in combination with the revision of the Replacement Measures of the Ministry of Industry and Information Technology. If the state or provincial governments have new regulations, they shall be implemented in accordance with the new regulations.

All can be viewed after purchase
Correlation

On November 25, the Department of Raw Materials Industry of the Department of Industry and Information Technology of Yunnan Province issued a public announcement on the Rules for the Implementation of Capacity Replacement in the Cement and Glass Industry of Yunnan Province (Draft for Opinions). The main revised content is the requirement for supplementary production of cement clinker.

2026-11-26 13:50:18

On November 25, the Department of Raw Materials Industry of the Department of Industry and Information Technology of Yunnan Province issued a public announcement on the Rules for the Implementation of Capacity Replacement in the Cement and Glass Industry of Yunnan Province (Draft for Opinions). The main revised content is the requirement for supplementary production of cement clinker.